Photos: April-June 2018

Begin June aerial photos: facing west, view from eastern end of Project limits from Pierpont Road, looking towards Scott Road (Najla Noujaim Memorial) Bridge
Begin June aerial photos: facing west, view from eastern end of Project limits, from Pierpont Road, looking towards Scott Road (Najla Noujaim Memorial) Bridge


Facing west, view from eastern end of Project limits at Pierpont Road, with sound barrier wall construction along WB I-84
Facing west, view from eastern end of Project limits at Pierpont Road, with sound barrier wall construction along WB I-84


With east at top, installation of sound barrrier wall along, WB I-84, west of Austin Road
With east at top, installation of sound barrrier wall, along WB I-84, west of Austin Road


Installation of sound barrrier wall along, WB I-84, west of Austin Road; the underpass road is Pierpont Road
Installation of sound barrrier wall, along WB I-84, west of Austin Road; the underpass road is Pierpont Road


Installation of sound barrrier wall along, WB I-84, west of Austin Road
Installation of sound barrrier wall, along WB I-84, west of Austin Road


Facing west, new I-84 lanes and median west of Pierpont Road
Facing west, new I-84 lanes and median, west of Pierpont Road


Facing west, Scott Road Bridge vicinity with new western portion under construction
Facing west, Scott Road Bridge vicinity with new western portion under construction


Facing north, Scott Road Bridge vicinity with new alignment of Beaver Pond Brook and new sanitary sewer
Facing north, Scott Road Bridge vicinity with new alignment of Beaver Pond Brook and new sanitary sewer


Scott Road Bridge, with new WB 25 off-ramp and realignment of Beaver Pond Brook
Scott Road Bridge, with new WB 25 off-ramp and realignment of Beaver Pond Brook


Facing south, Scott Road Bridge with new center pier and abutments on western portion
Facing south, Scott Road Bridge with new center pier and abutments on western portion


Facing southeast, Scott Road Bridge with new center pier and abutments on western portion under construction
Facing southeast, Scott Road Bridge, with new center pier and abutments on western portion, under construction


Facing northeast, realigned Beaver Pond Brook and WB 25 off-ramp, east of Scott Road Bridge
Facing northeast, realigned Beaver Pond Brook and WB 25 off-ramp, east of Scott Road Bridge


Facing east, I-84 west of Scott Road Bridge with WB 25 on-ramp
Facing east, I-84 west of Scott Road Bridge, with WB 25 on-ramp


Facing east, WB 25 on-ramp with future Plank Road East to the north of it
Facing east, WB 25 on-ramp with future Plank Road East to the north


Facing northeast, path for future Plank Road East between the two new retaining walls, north of I-84
Facing northeast, path for future Plank Road East between the two new retaining walls, north of I-84


Facing north, path for future Plank Road East between the two new retaining walls, north of I-84
Facing north, path for future Plank Road East between the two new retaining walls, north of I-84


Facing northwest, the path for future Plank Road East is north of I-84; new culvert is top left
Facing northwest, the path for future Plank Road East is north of I-84; new culvert is top left


Facing west, the path for future Plank Road East is north of I-84, to Harpers Ferry Road
Facing west, the path for future Plank Road East is north of I-84, to Harpers Ferry Road


Facing south, east of Harpers Ferry Road Bridge, new culvert goes under I-84 and future Plank Road East
Facing south, east of Harpers Ferry Road Bridge, new culvert goes under I-84 and future Plank Road East


Facing southwest, new Harpers Ferry Bridge; former I-84 alignment was under the portion of Harpers Ferry Road (former bridge) now being demolished; culvert from previous photo is top left
Facing southwest, new Harpers Ferry Bridge; former I-84 alignment was under the portion of Harpers Ferry Road (former bridge) now being demolished; culvert from previous photo is top left


With north at top, new culvert under I-84 and future Plank Road East will carry Beaver Pond Brook from south side of I-84, to the north
With north at top, new culvert under I-84 and future Plank Road East will carry Beaver Pond Brook from south side of I-84, to the north


Facing southwest, new culvert under future Plank Road East; Plank Road cul-de-sac is bottom left
Facing southwest, new culvert under future Plank Road East; Plank Road cul-de-sac is bottom left


Facing south, demolition of former Harpers Ferry Road Bridge and former EB 25 off-ramp
Facing south, demolition of former Harpers Ferry Road Bridge and former EB 25 off-ramp


Facing east, new Harpers Ferry Bridge with new I-84 alignment underneath it
Facing east, new Harpers Ferry Bridge with new I-84 alignment underneath it


Facing north, new Harpers Ferry Bridge with new EB 25 off-ramp and Reidville Drive intersection
Facing north, new Harpers Ferry Bridge with new EB 25 off-ramp and Reidville Drive intersection


With north at top, demolition of former Harpers Ferry Road Bridge and former EB 25 off-ramp; realigned Mad River
With north at top, demolition of former Harpers Ferry Road Bridge and former EB 25 off-ramp; realigned Mad River


With north at top, demolition in former Harpers Ferry Road Bridge vicinity, and construction (left) of new WB 25 on-ramp
With north at top, demolition in former Harpers Ferry Road Bridge vicinity, and construction (left) of new WB 25 on-ramp


With north at top, path for future Plank Road east is north of I-84 and east of Harpers Ferry Road
With north at top, path for future Plank Road east is north of I-84 and east of Harpers Ferry Road


With north at top and Reidville Drive at bottom; Harpers Ferry Road Bridge is closed and traffic is detoured during this phase of construction
With north at top and Reidville Drive at bottom; Harpers Ferry Road Bridge is closed and traffic is detoured during this phase of construction


Facing southwest, Harpers Ferry Road Bridge vicinity
Facing southwest, Harpers Ferry Road Bridge vicinity


Facing south, Reidville Drive new alignment south of I-84
Facing south, Reidville Drive new alignment south of I-84


Facing southwest, from Harpers Ferry Road to Hamilton Avenue Bridge
Facing southwest, from Harpers Ferry Road to Hamilton Avenue Bridge


Facing south, Hamilton Avenue Bridge with new concrete deck on eastern portion
Facing south, Hamilton Avenue Bridge with new concrete deck on eastern portion


Facing south, future EB 23 on-ramp from Hamilton Avenue, south of I-84
Facing south, future EB 23 on-ramp from Hamilton Avenue, south of I-84


Facing north, Hamilton Avenue Bridge vicinity
Facing north, Hamilton Avenue Bridge vicinity


Facing northeast, Hamilton Avenue Bridge vicinity; future EB 23 on-ramp and new: EB 25 off-ramp; WB 23 off-ramp
Facing northeast, Hamilton Avenue Bridge vicinity; future EB 23 on-ramp and new: EB 25 off-ramp; WB 23 off-ramp


Facing west, Hamilton Avenue Bridge to Washington Street, the end of the Project limits - end June aerial photos
Facing west, Hamilton Avenue Bridge to Washington Street, the end of the Project limits – end June aerial photos


Landscaping reconstructed river bank along former WB 25 off ramp, now the Beaver Pond Brook
Landscaping reconstructed river bank along former WB 25 off-ramp, now the Beaver Pond Brook


Facing west, towards Harpers Ferry Road, precast concrete section are filled for retaining wall along Future Plank Road East
Facing west, towards Harpers Ferry Road, precast concrete section are filled for retaining wall along Future Plank Road East


Facing east, installing precast concrete blocks for retaining wall along future Plank Road East.
Facing east, installing precast concrete blocks for retaining wall along future Plank Road East.


Facing northeast, two retaining walls between which is the path for future Plank Road East, the frontage road between Scott and Harpers Ferry Roads
Facing northeast, two retaining walls between which is the path for future Plank Road East, the frontage road between Scott and Harpers Ferry Roads


Facing east, hydroseeding for slope cover and erosion prevention east of Harpers Ferry Road
Facing east, hydroseeding for slope cover and erosion prevention east of Harpers Ferry Road


Facing west, new alignment of I-84, west of Harpers Ferry Road Bridge
Facing west, new alignment of I-84, west of Harpers Ferry Road Bridge


Facing south toward I-84 and EB 25 off-ramp, right is construction of abutment for future WB 25 on-ramp bridge, and left is former EB 23 off-ramp for demolition
Facing south toward I-84 and EB 25 off-ramp, right is construction of abutment for future WB 25 on-ramp bridge, and left is former EB 23 off-ramp for demolition


Facing east, left, abutment for future WB 25 on-ramp bridge over the Mad River; former EB 23 off ramp is center
Facing east, left, abutment for future WB 25 on-ramp bridge over the Mad River; former EB 23 off ramp is center


Facing south, new I-84 bridges over the Mad River, eastern crossing
Facing south, new EB and WB I-84 bridge over the Mad River, eastern crossing


Facing west, path of future Plank Road East up to Harpers Ferry Road
Facing west, path of future Plank Road East up to Harpers Ferry Road


Pile driving for foundation of abutment for future WB 25 on-ramp
Pile driving for foundation of abutment for future WB 25 on-ramp


Some culvert sections in place for future culvert under Plank Road East, adjacent to I-84
Some culvert sections in place for future culvert under Plank Road East, adjacent to I-84


View from inside culvert to carry Beaver Pond Brook under future Plank Road East
View from inside culvert to carry Beaver Pond Brook under future Plank Road East


Installation of precast concrete sections for culvert under Plank Road East
Installation of precast concrete sections for culvert under Plank Road East


Installation of precast concrete sections for culvert under Plank Road East
Installation of precast concrete sections for culvert under Plank Road East


Sanitary sewer pipe installation, west of Harpers Ferry Road, north of I-84
Sanitary sewer pipe installation, west of Harpers Ferry Road, north of I-84


Facing north, installation of sewer pipe west of Harpers Ferry Road, north of I-84
Facing north, installation of sewer pipe west of Harpers Ferry Road, north of I-84


Foundation and some precast sections along path for retaining wall on south side of future WB 25 on-ramp
Foundation and some precast sections along path for retaining wall on south side of future WB 25 on-ramp


Filling precast concrete blocks for retaining wall along future WB 25 on-ramp
Filling precast concrete blocks for retaining wall along future WB 25 on-ramp


Facing west, concrete pour for eastern abutment for future WB 25 on-ramp
Facing west, concrete pour for eastern abutment for future WB 25 on-ramp


Scott Road Bridge, with new WB 25 off-ramp and realignment of Beaver Pond Brook
Scott Road Bridge, with new WB 25 off-ramp and realignment of Beaver Pond Brook


Facing south, Scott Road Bridge with new center pier and abutments on western portion
Facing south, Scott Road Bridge with new center pier and abutments on western portion


Facing southeast, Scott Road Bridge with new center pier and abutments on western portion under construction
Facing southeast, Scott Road Bridge with new center pier and abutments on western portion under construction


Facing northeast, realigned Beaver Pond Brook and WB 25 off-ramp, east of Scott Road Bridge
Facing northeast, realigned Beaver Pond Brook and WB 25 off-ramp, east of Scott Road Bridge


Facing east, I-84 west of Scott Road Bridge with WB 25 on-ramp
Facing east, I-84 west of Scott Road Bridge with WB 25 on-ramp


Facing east, WB 25 on-ramp with future Plank Road East to the north of it
Facing east, WB 25 on-ramp with future Plank Road East to the north of it


Facing northeast, path for future Plank Road East between the two new retaining walls, north of I-84
Facing northeast, path for future Plank Road East between the two new retaining walls, north of I-84


Facing north, path for future Plank Road East between the two new retaining walls, north of I-84
Facing north, path for future Plank Road East between the two new retaining walls, north of I-84


CTDOT District Engineer John Dunham was a guest panelist at the Western Connecticut Leadership's Transportation in Connecticut Alumni Program on June 1
CTDOT District Engineer John Dunham was a guest panelist at the Western Connecticut Leadership’s (WCL) Transportation in Connecticut Alumni Program on June 1; he presented upcoming work on the I-84 Waterbury Projects


CTDOT District Engineer John Dunham was a guest panelist at the Western Connecticut Leadership's Transportation in Connecticut Alumni Program
District Engineer John Dunham discusses transportation issues in CT at the WCL Alumni Program


CTDOT District Engineer John Dunham was a guest panelist at the Western Connecticut Leadership's Transportation in Connecticut Alumni Program
District Engineer John Dunham addresses questions at the event


CTDOT District Engineer John Dunham with program moderator Larry Rifkin
CTDOT District Engineer John Dunham with program moderator, Larry Rifkin


District Engineer John Dunham discusses I-84 Waterbury Projects with attendees of the program
District Engineer John Dunham discusses I-84 Waterbury Projects and CT transportation with attendees


Begin May aerial photos -facing southeast, the western Project limits, from Washington Street, with Hamilton Avenue Bridge
Begin May aerial photos – facing southeast, the western Project limits, from Washington Street, with Hamilton Avenue Bridge


Begin May aerial photos -facing east, the Project from Hamilton Avenue Brige to Harpers Ferry Road, and beyond
Facing east, the Project from Hamilton Avenue Brige to Harpers Ferry Road, and beyond


Facing west, Hamilton Avenue with future EB 23 on-ramp, new I-84 bridge over the Mad River, and new EB 25 off-ramp
Facing west, Hamilton Avenue with future EB 23 on-ramp, new I-84 bridge over the Mad River, and new EB 25 off-ramp


Facing northeast, from new I-84 bridge over Mad River south of Hamilton Park, to Harpers Ferry Road vicinity
Facing northeast, from new I-84 bridge over Mad River south of Hamilton Park, to Harpers Ferry Road vicinity


Facing east, Harpers Ferry Road vicinity
Facing east, Harpers Ferry Road vicinity


Facing north, new Harpers Ferry Road bridge with I-84 in new alignment; former alignment is adjacent to trees south of Plank Road
Facing north, new Harpers Ferry Road Bridge with I-84 in new alignment underneath it; former I-84 alignment is adjacent to the trees, south of Plank Road and north of I-84


Facing east, Harpers Ferry Road Bridge with new WB 25 off-ramp abutments under construction north of I-84
Facing east, Harpers Ferry Road Bridge with new WB 25 off-ramp abutments under construction, north of I-84


With north at top, temporary relocation of Mad River, construction of new abutments for new WB 25 on-ramp, and former EB 23 off-ramp for demolition
With north at top, temporary relocation of Mad River, construction of new abutments for new WB 25 on-ramp, and former EB 23 off-ramp for demolition


Facing north, future path for Plank Road East, north of I-84; new retaining wall and culvert under I-84 (left)
Facing north, future path for Plank Road East, north of I-84; new retaining wall and culvert under I-84 (bottom left)


Facing west, I-84 with new roadway and median; future path of Plank Road East is between retaining walls north of I-84
Facing west, I-84 with new roadway and median; future path of Plank Road East is between the retaining walls, north of I-84


Facing east toward Scott Road Bridge vicinity
Facing east toward Scott Road Bridge vicinity


Facing southwest, Scott Road Bridge with realigned Beaver Pond Brook, new WB 25 off-ramp and new Plank Road East
Facing southwest, Scott Road Bridge with realigned Beaver Pond Brook, new WB 25 off-ramp, and new Plank Road East


Facing west, Scott Road Bridge with abutments and pier for new western portion under construction
Facing east, Scott Road Bridge with abutments and pier, for new western portion, under construction


Facing east, Scott Road Bridge vicinity and new I-84 roadway path; end May aerial photos
Facing west, Scott Road Bridge vicinity and new I-84 roadway path; End May aerial photos


Representative Geraldo Reyes calls the meeting of the South End Neighborhood Association (SENA) to order May 11
Representative Geraldo Reyes calls the meeting of the South End Neighborhood Association (SENA) to order May 11


Residents gather for the meeting of the South End Neighborhood Association (SENA)
Residents gather for the meeting of the South End Neighborhood Association (SENA)


I-84 Waterbury Widening Project's Public Information team give a Project update presentation to SENA meeting attendees
I-84 Waterbury Widening Project’s Public Information team gives a Project update SENA meeting attendees


Begin April aerial photos - from east end of the Project limits, at Pierpont Road
Begin April aerial photos – from east end of the Project limits, at Pierpont Road


Facing west, towards Scott Road Bridge, new I-84 roadway and median
Facing west, towards Scott Road Bridge, new I-84 roadway and median


Scott Road Bridge - will be renamed the Najla G. Noujaim Memorial Bridge
Scott Road Bridge – will be renamed the Najla G. Noujaim Memorial Bridge


Facing southwest, Scott Road Bridge with western portion under construction
Facing southwest, Scott Road Bridge with western portion under construction


Facing south, WB 25 off ramp, and former off-ramp site with construction of sanitary sewer
Facing south, WB 25 off ramp, and former off-ramp site with construction of sanitary sewer


From above, with south at top, Scott Road Bridge vicinity
With south at top, Scott Road Bridge vicinity


From above, with south at top, Scott Road Bridge with construction of new western pier and abutment footings
With south at top, Scott Road Bridge with construction of new western pier and abutment footings


Facing northeast, new alignment of Beaver Pond Brook, and new WB 25 off-ramp
Facing northeast, new alignment of Beaver Pond Brook, and new WB 25 off-ramp


Facing northeast, sound barrier wall along WB 25 off-ramp, and sanitary sewer work north of Beaver Pond Brook
Facing northeast, sound barrier wall along WB 25 off-ramp, and sanitary sewer work north of Beaver Pond Brook


Facing northeast, Scott Road Bridge; construction of footing for new northwest abutment and center pier
Facing northeast, Scott Road Bridge; construction of footing for new northwestern abutment and center pier


Facing north, I-84 and Plank Road East, west of Scott Road Bridge
Facing north, I-84 and Plank Road East, west of Scott Road Bridge


Facing south, I-84 wtih WB 25 on-ramp
Facing south, I-84 wtih WB 25 on-ramp


Facing north, retaining walls between which is the path for future Plank Road East
Facing north, retaining walls demarcate the path for future Plank Road East


Facing west, I-84 lanes and median south of future Plank Road East
Facing west, I-84 lanes and median south of future Plank Road East


Facing west, Harpers Ferry Road Bridge vicinity
Facing west, Harpers Ferry Road Bridge vicinity


Facing west, new Reidville Drive to Harpers Ferry Road
Facing west, new Reidville Drive to Harpers Ferry Road


Facing southwest, Harpers Ferry Road vicinity
Facing southwest, Harpers Ferry Road vicinity


Facing south, Plank Road cul-de-sac (former off -ramp), and new culvert under new I-84
Facing south, Plank Road cul-de-sac (former off-ramp), and new culvert under new I-84


Facing south, Harpers Ferry Road to East Main Street, with new Plank Road culvert and Mad River
Facing south, Harpers Ferry Road to East Main Street, with new Plank Road culvert and Mad River


Facing southeast, former EB 25 off-ramp and site where new WB 25 on-ramp is under construction
Facing southeast, former EB 25 off-ramp and site where new WB 25 on-ramp is under construction


Facing southeast, new bridge decks for I-84 over the Mad River, eastern crossing
Facing southeast, new bridge decks for I-84 over the Mad River, eastern crossing


facing northeast, path for new Plank Road East and WB 25 on-ramp, north of new I-84
Facing northeast, path for new Plank Road East and WB 25 on-ramp, north of new I-84


Facing northwest, EB 25 off-ramp, Harpers Ferry Road and Reidville Drive intersection; new I-84 under new Harpers Ferry Road Bridge
Facing northwest, EB 25 off-ramp, Harpers Ferry Road and Reidville Drive intersection, at left


Facing northwest, new I-84 under new Harpers Ferry Road Bridge
Facing northwest, new I-84 under new Harpers Ferry Road Bridge


Facing southwest, with I-84 bridge over Mad River, western crossing, at bottom, looking toward Hamilton Avenue Bridge
Facing southwest, with I-84 bridge over Mad River, western crossing, at bottom, looking toward Hamilton Avenue Bridge


Facing north, I-84 and EB 25 off-ramp over the Mad River, western crossing
Facing north, I-84 and EB 25 off-ramp over the Mad River, western crossing


With east at top, new I-84 bridge and EB 25 off-ramp, and new pedestrian bridge over the Mad River, western crossing
With east at top, new I-84 bridge and EB 25 off-ramp, and new pedestrian bridge over the Mad River, western crossing


With east at top, new I-84 bridge and EB 25 off-ramp, and new pedestrian bridge over the Mad River, western crossing
With east at top, new I-84 bridge and EB 25 off-ramp, and new pedestrian bridge over the Mad River, western crossing


Facing southweest, Hamilton Avenue Bridge vicinity
Facing southwest, Hamilton Avenue Bridge vicinity


Facing south, Hamilton Avenue Bridge vicinity with eastern bridge deck under construction
Facing south, Hamilton Avenue Bridge vicinity with eastern bridge deck under construction


Facing south, Hamilton Avenue Bridge with new EB 23 on-ramp from southeast end of bridge under construction
Facing south, Hamilton Avenue Bridge with new EB 23 on-ramp from southeast end of bridge, under construction


Facing north, new EB 23 on-ramp from Hamilton Avenue Bridge under construction
Facing north, new EB 23 on-ramp from Hamilton Avenue Bridge under construction


Facing east, from Hamilton Avenue Bridge to Harpers Ferry Road Bridge
Facing east, from Hamilton Avenue Bridge to Harpers Ferry Road Bridge


Facing south, temporary loop ramp, and median work at western end of Project limits at Washington Street
Facing south, temporary loop ramp, and median work at western end of Project limits – Washington Street


End April aerail photos, facing east, from Hamilton Avenue Bridge to Harpers Ferry Road Bridge, and beyond
End April aerial photos, facing east, from Hamilton Avenue Bridge to Harpers Ferry Road Bridge, and beyond


Pouring concrete to finish median cap east of Hamilton Avenue
Pouring concrete to finish median cap east of Hamilton Avenue


Fence installation on retaining wall along future Plank Road East
Fence installation on retaining wall along future Plank Road East


Fence installation on top of retianig wall along future Plank Road East
Fence installation on top of retaining wall along future Plank Road East


Slope construction east of Harpers Ferry Road
Slope construction east of Harpers Ferry Road


COnstructing form for concrete abutment for future WB 25 on-ramp west of Harpers Ferry Road
Constructing form for concrete abutment for future WB 25 on-ramp west of Harpers Ferry Road


Workers with form for concrete pour for bridge abutment for future WB 25 on-ramp
Workers construct form for concrete pour for bridge abutment for future WB 25 on-ramp


Preparing deck finishing machine on Hamilton Avenue Bridge
Preparing deck finishing machine on Hamilton Avenue Bridge


Preparing deck finishing machine for concrete pour on Hamilton Avenue Bridge
Preparing deck finishing machine for concrete pour on Hamilton Avenue Bridge


Conduit installation on Hamilton Avenue Bridge
Conduit installation on Hamilton Avenue Bridge


Construction of Hamilton Avuenue Bridge deck
Construction of Hamilton Avuenue Bridge deck


Facing south, Hamilton Avenue Bridge deck construction
Facing south, Hamilton Avenue Bridge deck construction


Facing sorth,construction of deck of new eastern portion of Hamilton Avenue Bridge, with stay-in-place forms, shear studs, and rebar
Facing sorth,construction of deck of new eastern portion of Hamilton Avenue Bridge, with stay-in-place forms, shear studs, and rebar


Shear stud installation on Hamilton Avenue Bridge deck
Shear stud installation on Hamilton Avenue Bridge deck


Facing north,construction of deck of new eastern portion of Hamilton Avenue Bridge
Facing north, construction of deck of new eastern portion of Hamilton Avenue Bridge


Facing north, stay-in-place forms on deck of new eastern portion of Hamilton Avenue Bridge
Facing north, stay-in-place forms on deck of new eastern portion of Hamilton Avenue Bridge


Facing north, just west of Scott Road Bridge - in the foreground is the form for the new bridge's (western portion) center pier. Behind it, a soil nail wall supports earth under new Plank Road East, and is the site of the future northwestern abutment
Facing north, west of Scott Road Bridge – in the foreground is the form for the new bridge’s (western portion) center pier. Behind it, a soil nail wall supports earth under new Plank Road East, and is the site of the future northwestern abutment


Facing west from northern end of Scott Road Bridge, looking into the new footing of the future northwestern abutment.
Facing west from northern end of Scott Road Bridge, looking into the new footing of the future northwestern abutment.


Facing north, new pedestrian bridge over Mad River, south of Hamilton Park, and sound barrier wall along EB 25 off-ramp
Facing north, new pedestrian bridge over Mad River, south of Hamilton Park, and sound barrier wall along EB 25 off-ramp


Facing west, bridge deck of future WB I-84 bridge over Mad River eastern crossing
Facing west, bridge deck of future WB I-84 bridge over Mad River eastern crossing


Facing east, east of Harpers Ferry Road - future path of WB I-84
Facing east, east of Harpers Ferry Road – future path of WB I-84


Facing south, I-84 east of Hamilton Avenue
Facing south, I-84 east of Hamilton Avenue


Light pole installation in center median
Light pole installation in center median


Western pier construction for new Scott Road Bridge
Western pier construction for new Scott Road Bridge


Facing west, view up future EB 23 on-ramp, east of Hamilton Avenue
Facing west, view up future EB 23 on-ramp, east of Hamilton Avenue


Facing west, view up future EB 23 on-ramp, east of Hamilton Avenue
Facing west, view up future EB 23 on-ramp, east of Hamilton Avenue


Facing west, soil nail wall construction at northwestern end of new Scott Road Bridge
Facing west, soil nail wall construction at northwestern end of new Scott Road Bridge


Construction of footing for western portion of Scott Road Bridge's center pier
Construction of footing for western portion of Scott Road Bridge’s center pier


Facing west, excavation for north-western abutment of Scott Road Bridge
Facing west, excavation for northwestern abutment of Scott Road Bridge


Facingsoutheast, west of Scott Road Bridge - soil nail wall to be behind new north-western bridge abutment
Facing southeast, west of Scott Road Bridge – soil nail wall to be behind new north-western bridge abutment