I-84 Waterbury Widening

I-84 Waterbury Widening

Images go here.

Photos: April-June 2015


Project site south of Reidville Drive with blast mats in place (on right) before rock blasting.
Project site south of Reidville Drive with blast mats in place (on right) before rock blasting.


View of I-84 above intersection of Harpers Ferry Road and Reidville Drive with Plank Road construction in distance.
View of I-84 above intersection of Harpers Ferry Road and Reidville Drive with Plank Road construction in distance.


Governor Dannel P. Malloy holds a press conference, June 19, 2015, addressing transportation improvements currently under way, and plans for the future. CTDOT Deputy Commissioner Anna M. Barry and Mayor O'Leary presented opening remarks.
Governor Dannel P. Malloy holds a press conference, June 19, 2015, addressing transportation improvements currently under way, and plans for the future. CTDOT Deputy Commissioner Anna M. Barry and Mayor of Waterbury, the Honorable Neil O’Leary presented opening remarks.


CTDOT Deputy Commissioner Anna M. Barry presents opening remarks  at June 19, 2015 press conference.
CTDOT Deputy Commissioner Anna M. Barry presents opening remarks during the Governor’s press conference.


Governor Dannel P. Malloy and Waterbury Mayor Neil O'Leary address the press June 19, 2015 at Hamilton Avenue commuter lot.
Governor Dannel P. Malloy and Waterbury Mayor Neil O’Leary address the press June 19, 2015 at Hamilton Avenue commuter lot.


I-84 looking east from Hamilton Ave. Bridge
I-84 looking east from Hamilton Avenue Bridge


I-84 looking west from Reidville Drive area
I-84 looking west from Reidville Drive area


I-84 looking east from Scott Road Bridge area
I-84 looking east from Scott Road Bridge area


I-84 looking east
I-84 looking east; Harpers Ferry Road & Scott Road Bridge and Mad River


Cofferdams for construction of footings for pedestrian bridge across Mad River south of Hamilton Park
Cofferdams for construction of footings for pedestrian bridge across Mad River south of Hamilton Park


Cofferdams for construction of footings for pedestrian bridge across Mad River south of Hamilton Park
Cofferdams for construction of footings for pedestrian bridge across Mad River south of Hamilton Park


Lowering forms for construction of pedestrian bridge footings
Lowering forms for construction of pedestrian bridge footings


Steel for footing of pedestrian bridge
Steel for footing of pedestrian bridge


Sedimentation basin for Mad River near pedestrian bridge south of I-84 and Hamilton Park
Sedimentation basin for Mad River near pedestrian bridge south of I-84 and Hamilton Park


Installation of temporary drainage along I-84 EB (#1 in photo series of 3)
Installation of temporary drainage along I-84 EB (#1 in photo series of 3)


Installation of temporary drainage along I-84 EB (#2 of photo series of 3)
Installation of temporary drainage along I-84 EB (#2 of photo series of 3)


Installation of temporary drainage along I-84 EB (#3 in photo series of 3)
Installation of temporary drainage along I-84 EB (#3 in photo series of 3)


Hydroseeding land between I-84 EB and Reidville Drive, west of Plank Road
Hydroseeding land between I-84 EB and Reidville Drive, west of Plank Road


Panoramic view of hydroseeded landscape
Panoramic view of hydroseeded landscape


Hydroseeded land along I-84 EB
Hydorseeded land along I-84 EB


Rock drilling before blasting
Rock drilling before blasting


Rock blasting I-84 EB Exit 23 Off Ramp 1 of 3 on 5/13/15
Rock blasting I-84 EB Exit 23 Off Ramp 1 of 3 on 5/13/15


Rock blasting I-84 EB Exit 23 Off Ramp 2 of 3 on 5/13/15
Rock blasting I-84 EB Exit 23 Off Ramp 2 of 3 on 5/13/15


Rock blasting I-84 EB Exit 23 Off Ramp 2 of 3 on 5/13/15
Rock blasting I-84 EB Exit 23 Off Ramp 2 of 3 on 5/13/15


Location for relocation of Mad River and proposed I-84 EB
Location for relocation of Mad River and proposed I-84 EB


Future Reidville Road
Future Reidville Drive


Mad River along Harpers Ferry Road
Mad River along Harpers Ferry Road


Preparing a reaction wall for pipe jacking
Preparing a reaction wall for pipe jacking


I-84 WB panoramic view from Hamilton Ave.
I-84 WB panoramic view from Hamilton Ave.


I-84EB Entrance 23/Route 69
I-84EB entrance from Route 69 – tree clearing


Tree harvester and feller buncher
Tree harvester and feller buncher


Tree clearing along I-84
Tree clearing along I-84


Project aerial
Looking east from Hamilton Avenue bridge


Project aerial
Looking west from Harpers Ferry Road


Project aerial
Looking east from Harpers Ferry Road area


Project aerial
Looking east from Harpers Ferry Road area


Project aerial
Looking east from Scott Road area


Project aerial
Looking west from Austin Road area