I-84 Waterbury Widening

I-84 Waterbury Widening

Images go here.

Photos: Jan-Mar 2018


End March aerial photos at Pierpont Road vicinity: Facing east, foundation for new sound barrier wall along EB 25 A on-ramp
Begin March aerial photos: Facing west, foundation for new sound barrier wall along WB 25A on-ramp


Facing southeast, foundation for new sound barrier wall along EB 25 A on-ramp
Facing southwest, foundation for new sound barrier wall along WB 25A on-ramp


Facing east, the Project limits from Pierpont Road
Facing west, the Project limits beginning from Pierpont Road vicinity


Facing east, EB 25 off-ramp and WB 25 on-ramp at Scott Road Bridge
Facing west, WB 25 off-ramp and EB 25 on-ramp at Scott Road Bridge


Facing north, former WB 25 off-ramp with new sewer construction, and new WB 25 off-ramp
Facing north, former WB 25 off-ramp with new sewer construction, and new WB 25 off-ramp


Facing south, Scott Road Bridge vicinity with realigned Mad River
Facing south, Scott Road Bridge vicinity with realigned Mad River


Facing south, Scott Road Bridge vicinity with realigned Mad River, new off-ramp and Plank Road alignment
Facing south, Scott Road Bridge vicinity with realigned Mad River, new off-ramp and Plank Road alignment


Facing southeast, new pier footing and abutment under construction for Scott Road Bridge
Facing southeast, new center pier footing and abutment under construction for Scott Road Bridge


Facing east, Scott Road Bridge with western center pier and abutments under construction
Facing east, Scott Road Bridge with western center pier footing and abutments under construction


Facing north, Scott Road Bridge and realigned Mad River
Facing north, Scott Road Bridge new eastern portion, and western portion under construction


Facing west, I-84 roadway and new median west of Scott Road Bridge
Facing west, I-84 roadway and new median west of Scott Road Bridge


Facing northeast, new culvert for Mad River under I-84 at WB 25 on-ramp, west of Scott Road Bridge
Facing northeast, new culvert for Mad River under I-84 at WB 25 on-ramp, west of Scott Road Bridge


Facing southwest, I-84 roadway and median construction, and path for future Plank Road East
Facing southwest, I-84 roadway and median construction, and path for future Plank Road East


Facing west, I-84 and median reconstruction, and new path for Plank Road East between two new retaining walls
Facing west, I-84 and median reconstruction, and new path for Plank Road East, between two new retaining walls


Facing north, roadway inder construction between two retaining walls north of I-84 is new path for local two-way road, Plank Road East
Facing north, path for new Plank Road East under construction between two retaining walls, north of I-84


Facing west, west of Harpers Ferry Road is new culvert for Mad River under I-84
Facing west, east of Harpers Ferry Road is new culvert for Mad River under I-84


Facing south, Harpers Ferry Road Bridge vicinity
Facing south, Harpers Ferry Road Bridge vicinity


Facing west, Harpers Ferry Road vicinity with new WB 25 on-ramp construction
Facing west, Harpers Ferry Road vicinity with new WB 25 on-ramp construction


Facing south, new Reidville Drive and EB I-84 alignment west of Harpers Ferry Road
Facing south, new Reidville Drive and EB I-84 alignment, east of Harpers Ferry Road


Facing southeast, new Reidville Drive and EB I-84 in their new alignments
Facing southeast, new Reidville Drive and EB I-84 in their new alignments


Facing south, new EB 25 off-ramp over the Mad River
Facing south, new EB 25 off-ramp over the Mad River


Facing southwest, pumping concrete into footing for new EB on-ramp bridge over Mad River
Facing southeast, pumping concrete into footing for new WB on-ramp bridge over Mad River


Facing northwest, Harpers Ferry Road Bridge with future WB I-84 adjacent to new EB I-84 alignment
Facing northwest, Harpers Ferry Road Bridge with future WB I-84 adjacent to new EB I-84 alignment


Facing northwest, pumping concrete into footing of new WB 25 on-ramp, west of Harpers Ferry Road Bridge
Facing northwest, pumping concrete into footing of new WB 25 on-ramp, west of Harpers Ferry Road Bridge


Facing northeast, towards Hamilton Avenue; new I-84 and EB 25 off ramp bridges over Mad River are lower right
Facing northwest, towards Hamilton Avenue; lower right is new I-84 and EB 25 off-ramp bridge over Mad River


Facing south, new I-84 and EB 25 off-ramp bridges over the Mad River, western crossing
Facing south, new I-84 and EB 25 off-ramp bridge over the Mad River, western crossing


Facing northeast, new I-84, EB 25 off-ramp and pedestrian bridges over the Mad River, western crossing
Facing northeast, new I-84, EB 25 off-ramp and pedestrian bridges over the Mad River, western crossing


Facing north, new I-84, EB 25 off-ramp and pedestrian bridges over the Mad River, western crossing; and sound barrier wall
Facing north, new I-84, EB 25 off-ramp and pedestrian bridges over the Mad River, western crossing; and sound barrier wall


Facing northwest, Hamilton Avenue Bridge vicinity
Facing northwest, Hamilton Avenue Bridge vicinity


Facing west, eastern portion of Hamilton Avenue Bridge with stay-in-place forms on bridge deck
Facing west, eastern portion of Hamilton Avenue Bridge with stay-in-place forms on bridge deck


Facing southwest, future EB 23 on-ramp and eastern portion of Hamilton Avenue Bridge under construction
Facing southwest, future EB 23 on-ramp and eastern portion of Hamilton Avenue Bridge under construction


Facing east, Hamilton Avenue Bridge
Facing east, Hamilton Avenue Bridge


Facing northeast, Hamilton Avenue Bridge
Facing northeast, Hamilton Avenue Bridge


Facing northeast, Hamilton Avenue Bridge eastern portion, EB 23 off-ramp and future EB on-ramp intersection
Facing northeast, Hamilton Avenue Bridge eastern portion, EB 23 off-ramp and future EB on-ramp intersection


Facing southeast, I-84 west of Hamilton Avenue, with median work to end of Project limits at Washington Street
Facing southeast, I-84 west of Hamilton Avenue, with roadway and median work to end of Project limits at Washington Street


End March aerial photos: Facing east, from Hamilton Avenue, and beyone, the I-84 Waterbury Project
End March aerial photos: Facing east, from Hamilton Avenue, and beyond; the I-84 Waterbury Project


cr hfr


Sequence of 7 photos depicting construction of foundation of sound barrier wall along WB I-84 west of WB 25 off-ramp
Sequence of 7 photos depicting construction of foundation of sound barrier wall along WB I-84, west of WB 25 off-ramp


Drilling holes for foundation of sound barrier wall along WB I-84 west of WB 25 off-ramp
Drilling holes for foundation of sound barrier wall along WB I-84, west of WB 25 off-ramp


Rebar cages await installation in drilled foundation of sound barrier wall east of WB 25 off-ramp
Rebar cages await installation in drilled foundation of sound barrier wall east of WB 25 off-ramp


Rebar cage in place in form for foundation of sound barrier wall under construction
Rebar cage in place in form for foundation of sound barrier wall, under construction


Form for foundation of sound barrier wall under construction
Form for foundation of new sound barrier wall


Anchor bolt form is lifted for installation in form for sound barrier wall
Anchor bolt form is lifted for installation in rebar cage form for sound barrier wall


Foundation for sound barrier wall with concrete poured and anchor bolts in place
Foundation for sound barrier wall with concrete poured and anchor bolts in place


Median work west of Scott Road Bridge
Median work west of Scott Road Bridge


Construction of leveling pad for new I-84 median (view from path of future Plank Road East)
Construction of leveling pad for new I-84 median (view from path of future Plank Road East)


Installation of precast concrete median sections on leveling pad
Installation of precast concrete median sections on leveling pad


Conduit installed in median
Conduit installed in median


Median work and installation of foundations for illuminations
Median work and installation of foundations for illuminations


Placing subgrade material for future WB I-84 west of Scott Road Bridge
Placing subgrade material for future WB I-84, west of Scott Road Bridge


Drainage installation along northwest side of future Scott Road
Drainage installation along northwest side of future Scott Road


Drilling holes for explosives before blasting along former WB 25 off-ramp.
Drilling holes for explosives before blasting along former WB 25 off-ramp.


Drilling holes for explosives before blasting along former WB 25 off-ramp.
Drilling holes for explosives before blasting along former WB 25 off-ramp


Blast mats cover explosives before blasting
Blast mats cover explosives before blasting


Workers install seeded topsoil to restore the slope behind new retaining wall on north side of futrue Plank Road East
Workers install seeded topsoil to restore the slope behind new retaining wall on north side of futrue Plank Road East


Workers install seeded topsoil for slope protection behind retaining wall along future Plank Road East
Workers install seeded topsoil for slope protection behind retaining wall along future Plank Road East


Drainage at the top of retaining wall
Drainage at the top of retaining wall


Completed slope behind retaining wall west of WB 25 on-ramp
Completed slope behind retaining wall, west of WB 25 on-ramp


Facing west, the beginning of the Project limits at Peirpont Road
Begin February aerial photos: Facing west, the eastern Project limits from Pierpont Road


Facing southwest, I-84 west of Pierpont Road
Facing southwest, I-84 west of Pierpont Road


Facing west, I-84 and Scott Road Bridge
Facing west, I-84 and Scott Road Bridge


Facing southwest, I-84 with new on- and off-ramps and Scott Road Bridge
Facing southwest, I-84 with new on- and off-ramps and Scott Road Bridge


Facing south, Scott Road Bridge with new eastern portion, and western portion being dismantled
Facing south, Scott Road Bridge with new eastern portion, and western portion being dismantled


Facing southeast, new sanitary sewer/pipework along the former WB 25 off-ramp
Facing southeast, new sanitary sewer/pipework along the former WB 25 off-ramp


Facing northeast, new sanitary sewer/pipework along the former WB 25 off-ramp
Facing northeast, new sanitary sewer/pipework along the former WB 25 off-ramp


With north at top, Scott Road Bridge with steel girdges for removal on western portion
With north at top, Scott Road Bridge with steel girdges for removal on western portion


With east at top, Scott Road Bridge before removal of structural steel on western portion
With east at top, Scott Road Bridge before removal of structural steel on western portion


Facing south, WB 25 on-ramp west of Scott Road Bridge, with I-84 median work
Facing south, WB 25 on-ramp west of Scott Road Bridge, with I-84 median work


Facing southeast, WB 25 on-ramp west of Scott Road Bridge, with I-84 median work
Facing southeast, WB 25 on-ramp west of Scott Road Bridge, with I-84 median work


Facing east, west of Scott Road Bridge, I-84 median work, and retaining walls adjacent to future Plank Road East (lower left)
Facing east, west of Scott Road Bridge, I-84 median work, and retaining walls adjacent to future Plank Road East (lower left)


Facing north, west of Scott Road Bridge, retaining walls adjacent to WB I-84 and future Plank Road East (lower left)
Facing north, west of Scott Road Bridge, retaining walls adjacent to WB I-84 and future Plank Road East (lower left)


Facing northwest, New EB I-84 with median work underway
Facing northwest, New EB I-84 with median work underway


Facing north, new culvert under, and new retaining wall adjacent to, new EB I-84
Facing north, new culvert under, and new retaining wall adjacent to, new EB I-84


Facing west, Harpers Ferry Road Bridge vicinity
Facing west, Harpers Ferry Road Bridge vicinity


Facing south, Harpers Ferry Road Bridge with EB I-84 in its new alignment
Facing south, Harpers Ferry Road Bridge with EB I-84 in its new alignment


Facing southeast, Harpers Ferry Road and Plank Road with Mad River
Facing southeast, Harpers Ferry Road and Plank Road with Mad River


Facing southeast, harpers Ferry Road Bridge with demolition of former EB I-84 and EB 25 off-ramp
Facing southeast, Harpers Ferry Road Bridge with demolition of former EB I-84 and EB 25 off-ramp


Facing southeast, EB I-84 in new alignment, and construction of future WB I-84 bridge adjacent to it
Facing southeast, EB I-84 in new alignment, and construction of future WB I-84 bridge adjacent to it


Facing east, Harpers Berry Road Bridge vicinity
Facing east, Harpers Ferry Road Bridge vicinity


Facing west, the new EB 25 off-ramp and new Reidville Drive intersection on Harpers Ferry Road
Facing west, the new EB 25 off-ramp and new Reidville Drive intersection on Harpers Ferry Road


With northwest at top, Harpers Ferry Road Bridge
With northwest at top, Harpers Ferry Road Bridge


Demolition of former EB I-84 and EB 25 off ramp, and construction of footing for new WB 25 on-ramp bridge
Demolition of former EB I-84 and EB 25 off-ramp, and construction of footing for new WB 25 on-ramp bridge


Facing west, I-84 west of Harpers Ferry Road
Facing east, I-84 east of Harpers Ferry Road


With east at top, Reidville Drive from Harpers Ferry Road
With east at top, Reidville Drive from Harpers Ferry Road


With north at top, new EB 25 off-ramp and bridge over Mad River
With north at top, new EB 25 off-ramp and bridge over Mad River


Facing south, east of Harpers Ferry Road, demolition of former EB I-84
Facing south, east of Harpers Ferry Road, demolition of former EB I-84


With Hamilton Park at north on right, new I-84 bridge over Mad River western crossing, and future EB 25 off-ramp
With Hamilton Park at north on right, new I-84 bridge over Mad River western crossing, and future EB 25 off-ramp


Facing northeast, new I-84 bridge over Mad River western crossing, and future EB 25 off-ramp; new pedestrian bridge (right)
Facing northeast, new I-84 bridge over Mad River western crossing, and future EB 25 off-ramp; new pedestrian bridge (right)


Facing northwest,I-84 east of Hamilton Avenue Bridge, with future EB 23 on-ramp, top left
Facing northwest, I-84 east of Hamilton Avenue Bridge, with future EB 23 on-ramp, top left


Facing east, Hamilton Avenue Bridge
Facing west, Hamilton Avenue Bridge


Facing east, Hamilton Avenue Bridge with new structural steel on eastern portion
Facing west, Hamilton Avenue Bridge with new structural steel on eastern portion


Facing southwest, future EB 23 on-ramp, from Hamilton Avenue Bridge
Facing southwest, future EB 23 on-ramp, from Hamilton Avenue Bridge


Facing south, future EB 23 on-ramp/bridge, from Hamilton Avenue Bridge
Facing south, future EB 23 on-ramp/bridge, from Hamilton Avenue Bridge


Facing southeast, Hamilton Avenue Bridge with new western portion, and new structural steel on eastern portion
Facing southeast, Hamilton Avenue Bridge with new western portion, and new structural steel on eastern portion


Facing north, Hamilton Avenue Bridge with new EB 25 off-ramp beneath it
Facing north, Hamilton Avenue Bridge with new EB 25 off-ramp beneath it


Facing west, the Project west of Hamilton Avenue to end of Project limits, at Washington Street
Facing west, the Project west of Hamilton Avenue to end of Project limits, at Washington Street


End February aerial shots: Facing east, the Project from west of Hamilton Avenue
End February aerial shots: Facing east, the Project from west of Hamilton Avenue


Facing north, workers backfill, grade and restore the slope behind the new retaining wall, west of WB 25 on-ramp
Facing north, workers backfill, grade and restore the slope behind the new retaining wall, west of WB 25 on-ramp


Facing north, workers backfill, grade and restore the slope behind the new retaining wall, west of WB 25 on-ramp
Facing north, workers backfill, grade and restore the slope behind the new retaining wall, west of WB 25 on-ramp


Facing west, worker prepares the footing for placement of the new I-84 median barrier
Facing west, worker prepares the footing for placement of the new I-84 median barrier


Facing west, workers assist in placement of the new I-84 median barrier
Facing west, workers assist in placement of the new I-84 median barrier


Begin January 2018 aerial views: from eastern project limits at Pierpont Road looking westward
Begin January 2018 aerial views: from eastern project limits at Pierpont Road looking westward


Facing southwest, I-84 over Pierpont Road with new lanes, median, retaining walls and sound barrier wall
Facing southwest, I-84 over Pierpont Road with new lanes, median, retaining walls and sound barrier wall


Facing west, toward Scott Road Bridge vicinity
Facing west, toward Scott Road Bridge vicinity


Facing west, toward Scott Road Bridge  with new eastern portion, and western portion under demolition
Facing west, toward Scott Road Bridge with new eastern portion, and western portion under demolition


Facing south, toward Scott Road Bridge with new eastern portion, and western portion under demolition
Facing south, Scott Road Bridge with new eastern portion, and western portion under demolition


With east at top, Scott Road Bridge with new eastern portion, and western portion under demolition
With east at top, Scott Road Bridge with new eastern portion, and western portion under demolition


Facing north, new Plank Road East and WB 25 off-ramp north of Scott Road Bridge and WB I-84
Facing north, new Plank Road East and WB 25 off-ramp, north of Scott Road Bridge and WB I-84


Facing north, WB 25 off ramp and sound barrier wall, with demolition of old ramp, north of Beaver Pond Brook
Facing north, WB 25 off ramp and sound barrier wall, with demolition of old ramp, north of Beaver Pond Brook


Facing northwest, WB 25 off ramp  with demolition of old ramp north of rerouted Beaver Pond Brook
Facing northwest, WB 25 off ramp with demolition of old ramp, north of rerouted Beaver Pond Brook


Facing west, I-84 and WB 25 on-ramp, west of Scott Road Bridge
Facing west, I-84 and WB 25 on-ramp, west of Scott Road Bridge


Facing west, I-84 and WB 25 on-ramp, west of Scott Road Bridge
Facing west, I-84 and WB 25 on-ramp, west of Scott Road Bridge


Facing east, I-84 and WB 25 on-ramp, west of Scott Road Bridge; median and lane work
Facing east, I-84 and WB 25 on-ramp, west of Scott Road Bridge; median and lane work


Facing north, new retaining walls and future path of Plank Road East, between Scott and Harpers Ferry Roads
Facing north, new retaining walls and future path of Plank Road East, between Scott and Harpers Ferry Roads


Facing northwest, new retaining walls and future path of Plank Road East, between Scott and Harpers Ferry Roads
Facing northwest, new retaining walls and future path of Plank Road East, between Scott and Harpers Ferry Roads


Facing west, I-84 with WB 25 on-ramp and retaining walls to the north
Facing west, I-84 with WB 25 on-ramp and retaining walls to the north


Facing west, I-84 retaining walls to the north for future Plank Road East to Harpers Ferry Road vicinity
Facing west, I-84 retaining walls to the north for future Plank Road East to Harpers Ferry Road vicinity


Facing south, New Reidville Drive, Harpers Ferry Road Bridge and EBI-84 in its new alignment; foreground: existing WB I-84 and former EB I-84
Facing south, New Reidville Drive, Harpers Ferry Road Bridge and EB I-84 in its new alignment; foreground: existing WB I-84 and former EB I-84


Facing south, Harpers Ferry Road Bridge, with demolition of former EB 25 off-ramp (lower right above WB I-84)
Facing south, Harpers Ferry Road Bridge, with demolition of former EB 25 off-ramp (lower right above WB I-84)


Facing south, new Reidville Drive, with path of former Reidville Drive (with dump truck) north of EB I-84
Facing south, new Reidville Drive, with path of former Reidville Drive (with dump truck) north of EB I-84


Facing east; new culvert under new EB I-84 and future WB I-84; demolished former EB I-84 and existing WB I-84
Facing east; new culvert under new EB I-84 and future WB I-84; demolished former EB I-84 and existing WB I-84


Facing north toward Plank Road/Harpers Ferry Road vicinity
Facing north toward Plank Road/Harpers Ferry Road vicinity


Facing south, new Harpers Ferry Road Bridge with new EB I-84 alignment and EB 25 off-ramp and Reidville Drive to the north
Facing south, new Harpers Ferry Road Bridge with new EB I-84 alignment and EB 25 off-ramp and Reidville Drive to the north


Facing southwest, Harpers Ferry Road vicinity with new Plank Road culvert and Mad River
Facing southwest, Harpers Ferry Road vicinity with new Plank Road culvert and Mad River


Facing southeast, demolition of former EB 25 off-ramp in preparation for construction of new WB 25 on-ramp
Facing southeast, demolition of former EB 25 off-ramp in preparation for construction of new WB 25 on-ramp


Facing northwest, preparation for pile driving for new WB 25 on-ramp bridge (lower left) from Harpers Ferry Road
Facing northwest, preparation for pile driving for new WB 25 on-ramp bridge (lower left) from Harpers Ferry Road


Facing west, Harpers Ferry Road vicinty
Facing west, Harpers Ferry Road vicinty


Facing north, Harpers Ferry Road vicinity with Reidville Drive in foreground
Facing north, Harpers Ferry Road vicinity with Reidville Drive in foreground


Harpers Ferry Road Bridge with east at top
Harpers Ferry Road Bridge with east at top of photo


Facing south, new EB 25 off ramp over the Mad River
Facing south, new EB 25 off-ramp over the Mad River


Future WB I-84 bridge over the Mad River, adjacent to new EB I-84, west of Harpers Ferry Road Bridge
Future WB I-84 bridge over the Mad River, adjacent to new EB I-84, west of Harpers Ferry Road Bridge


Facing east, view of Harpers Ferry Road Bridge vicinity
Facing east, view of Harpers Ferry Road Bridge vicinity


Facing north, new EB 25 off-ramp and Reidville Drive/Harpers Ferry Road intersection
Facing north, new EB 25 off-ramp and Reidville Drive/Harpers Ferry Road intersection


Facing south, new I-84 bridge over the Mad River eastern crossing, south of Hamilton Park.
Facing south, new I-84 bridge over the Mad River eastern crossing, south of Hamilton Park.


Facing west, new I-84 bridge and EB 25 off-ramp bridge over the Mad River western crossing, with Hamilton Park (right)
Facing west, new I-84 bridge and EB 25 off-ramp bridge over the Mad River western crossing, with Hamilton Park (right)


Facing west, Hamilton Avenue Bridge with steel erection underway on eastern portion over WB I-84
Facing west, Hamilton Avenue Bridge with steel erection underway on eastern portion over WB I-84


Facing south, Hamilton Avenue Bridge with portion of structural steel in place; girders on bridge and awaiting installation
Facing south, Hamilton Avenue Bridge with portion of structural steel in place; girders on bridge and awaiting installation


Facing south, future EB 23 on-ramp from Hamilton Avenue under construction
Facing south, future EB 23 on-ramp from Hamilton Avenue under construction


Facing south, future EB 23 on-ramp from Hamilton Avenue under construction, with EB 25 off-ramp underneath
Facing south, future EB 23 on-ramp from Hamilton Avenue under construction, with EB 25 off-ramp underneath


Steel girders in place on Hamilton Avenue Bridge over WB I-84
Steel girders in place on Hamilton Avenue Bridge over WB I-84


Facing east, steel girders in place on Hamilton Avenue Bridge over WB I-84
Facing east, steel girders in place on Hamilton Avenue Bridge over WB I-84


Facing northeast, future EB 23 on-ramp bridge over EB 25 off-ramp, from Hamilton Avenue
Facing northeast, future EB 23 on-ramp bridge over EB 25 off-ramp, from Hamilton Avenue


Facing northwest, Hamilton Avenue Bridge vicinity
Facing northwest, Hamilton Avenue Bridge vicinity


Facing east, loop ramp from Hamilton Avenue onto I-84, and entry to EB 25 off-ramp
Facing east, loop ramp from Hamilton Avenue onto I-84, and entry to EB 25 off-ramp


Facing east, view of the project limits from Washington Street vicinity eastward; end Jan. aerial photos
Facing east, view of the project limits from Washington Street vicinity eastward; end Jan. aerial photos


Installation of cross beams during nightime steel erection on Hamilton Avenue Brdge
Installation of cross beams during nightime steel erection on Hamilton Avenue Brdge


Installation of girders during nighttime steel erection on Hamilton Avenue Brdge
Installation of girders during nighttime steel erection on Hamilton Avenue Brdge


Crane lifts steel girder during nighttime steel erection on Hamilton Avenue Bridge over EB I-84
Crane lifts steel girder during nighttime steel erection on Hamilton Avenue Bridge over EB I-84


Nighttime steel erection on Hamilton Avenue Bridge over westbound I-84
Nighttime steel erection on Hamilton Avenue Bridge over westbound I-84


Nighttime steel erection on Hamilton Avenue Bridge over westbound I-84
Nighttime steel erection on Hamilton Avenue Bridge over westbound I-84


Nighttime steel erection on Hamilton Avenue Bridge over westbound I-84
Nighttime steel erection on Hamilton Avenue Bridge over westbound I-84


Facing west, preparation for removal of former EB Exit 25 off-ramp pavement, west of Harpers Ferry Road Bridge.
Facing west, preparation for removal of former EB Exit 25 off-ramp pavement, west of Harpers Ferry Road Bridge.