Photos: April-June 2017


Workers place sections of box culvert to carry Beaver Pond Brook under future I-84. Openings at the top will be in the future median to allownatural light to filter into stream habitat.
Workers place sections of new box culvert to carry Beaver Pond Brook under future I-84.


Beaver Pond Brook (left) will be relocated through new culvert under future I-84 (now between EB I-84 and Reidville Drive). Openings on culvert top to allow natural light to filter into the stream habitat from future center median.
Beaver Pond Brook (left) will be relocated through new culvert under future I-84 (now between EB I-84 and Reidville Drive). Openings on top of culvert will allow natural light to filter into the stream habitat from future center median.


Culvert 1227: Beaver Pond Brook under Future I-84
Culvert 1227: Beaver Pond Brook under Future I-84


Beaver Pond Brook relocated to flow through the southern portion of new two-chambered culvert (center) under future I-84, east of Harpers Ferry Road and north of Reidville Drive; East Mountain Brook enters from new culvert (at left).
Beaver Pond Brook relocated to flow through the southern portion of new two-chambered culvert (center) under future I-84, east of Harpers Ferry Road and north of Reidville Drive; East Mountain Brook enters from new culvert (at left).


Begin June aerial photos from east end of Project limits at Pierpont Road, looking west
Begin June aerial photos from east end of Project limits at Pierpont Road, looking west


Facing south, installation of drainage pipe and structures under future EB I-84 from Pierpont Road to EB 25 on ramp
Facing south, installation of drainage pipe and structures under future EB I-84 from Pierpont Road to EB 25 on ramp


Facing east, installation of drainage pipe and structures under future EB I-84 from Pierpont Road to EB 25 on ramp
Facing east, installation of drainage pipe and structures under future EB I-84 from Pierpont Road to EB 25 on ramp


Facing north, Scott Road Bridge and future WB 25 off ramp construction; realigned Beaver Pond Brook along existing ramp
Facing north, Scott Road Bridge and future WB 25 off ramp construction; realigned Beaver Pond Brook along existing ramp


Facing west, sound barrier wall along future WB 25 off ramp; future intersection: WB 25 off ramp/Scott Road/Plank Road East
Facing west, sound barrier wall along future WB 25 off ramp; future intersection: WB 25 off ramp/Scott Road/Plank Road East


Facing south, construction of eastern portion of Scott Road Bridge and future WB 25 off ramp
Facing south, construction of eastern portion of Scott Road Bridge and future WB 25 off ramp


Structural steel on eastern portion of Scott Road Bridge; once complete, western portion will be demolished and reconstructed
Structural steel on eastern portion of Scott Road Bridge; once complete, western portion will be demolished & reconstructed


Facing north, west of WB 25 on ramp, Retaining Wall 106 soil nail wall, with concrete block installation on eastern end
Facing north, west of WB 25 on ramp, Retaining Wall 106 soil nail wall, with concrete block installation on eastern end


Retaining Wall 106: soil nail wall, with concrete block installation beginning on eastern end
Retaining Wall 106: soil nail wall, with concrete block installation beginning on eastern end


Retaining Wall 106: soil nail wall, with concrete block installation beginning on eastern end
Retaining Wall 106: soil nail wall, with concrete block installation beginning on eastern end


Facing south, culvert between Reidville Drive and I-84 will carry Beaver Pond Brook under future I-84
Facing south, culvert between Reidville Drive and I-84 will carry Beaver Pond Brook under future I-84


View of culvert with existing path of Beaver Pond Brook to the north of it
View of culvert with existing path of Beaver Pond Brook to the north of it


View of culvert to the south of I-84; to the north, Plank Road cul-de-sac, former WB exit 24, permanently closed
View of culvert to the south of I-84; to the north, Plank Road cul-de-sac, former WB exit 24, permanently closed


Facing south at Reidville Drive/Harpers Ferry Road intersection; new pavement is future Reidville Drive
Facing south at Reidville Drive/Harpers Ferry Road intersection; new pavement is future Reidville Drive


Facing south at Reidville Drive/Harpers Ferry Road intersection; stay-in-place forms in place on future Harpers Ferry Road Bridge (center)
Facing south, stay-in-place forms in place on future Harpers Ferry Road Bridge (center)


Three bridges: EB 25 off ramp and I-84 over Mad River with concrete decks poured, and Harpers Ferry Road to be over I-84
Three bridges: EB 25 off ramp and I-84 over Mad River with concrete decks poured, and Harpers Ferry Road to be over I-84


Future path of I-84 is visible under Harpers Ferry Road Bridge; paved road at top will be Reidville Drive
Future path of I-84 is visible under Harpers Ferry Road Bridge; paved roadway along rock cut wall will be Reidville Drive


Structural steel in place for WB portion of  I-84 over Mad River western crossing
Structural steel in place for northern portion of I-84 over Mad River western crossing


Facing north, from top: Hamilton Park, structural steel for future I-84 lanes, new I-84 lanes, EB 25 off ramp, new pedestrian bridge
From top: Hamilton Park, structural steel for future I-84 lanes, new I-84 lanes, EB 25 off ramp, new pedestrian bridge


From left: Hamilton Park, structural steel for future I-84 lanes, new I-84 lanes, EB 25 off ramp, new pedestrian bridge
From left: Hamilton Park, structural steel for future I-84 lanes, new I-84 lanes, EB 25 off ramp, new pedestrian bridge


Facing west, from culvert to Reidville Drive/Harpers Ferry Road, to bridges over Mad River eastern crossing to bridge over Mad River western crossing
Facing west, future path for I-84


Facing southeast, Plank Road vicinity in foreground with culvert, future Reidville Drive and Harpers Ferry Road Bridge south of I-84
Facing southeast, Plank Road vicinity in foreground, future Reidville Drive and Harpers Ferry Road south of I-84


Facing south, construction of abutments for eastern portion of Hamilton Avenue Bridge and EB 23 on ramp
Facing south, construction of abutments for eastern portion of Hamilton Avenue Bridge and EB 23 on ramp


With western portion complete, construction of abutments for eastern portion of Hamilton Avenue Bridge and EB 23 on ramp
With western portion complete, construction of eastern portion of Hamilton Avenue Bridge and EB 23 on ramp


Future EB 23 on ramp north of wave-like retaining wall; structural steel bridge n left is future I-84 over Mad River western crossing
Facing south, future EB 23 on ramp is adjacent to existing EB I-84


Facing east, Hamilton Avenue Bridge vicinity
Facing east, Hamilton Avenue Bridge vicinity


Facing northeast, southern side of Hamilton Avenue Bridge with bridge abutment and EB 23 on ramp construction
Facing northeast, southern side of Hamilton Avenue Bridge with bridge abutment, and EB 23 on ramp construction


Facing south, southern side of Hamilton Avenue Bridge with bridge abutment and EB 23 on ramp construction
Facing south, southern side of Hamilton Avenue Bridge with bridge abutment and EB 23 on ramp construction


Sound barrier wall along EB 23 off ramp, and reconstructed median
Sound barrier wall along EB 23 off ramp, and reconstructed median


Facing west, view of EB 23 temporary loop on ramp west of Hamilton Avenue Bridge
Facing west, view of EB 23 temporary loop on ramp west of Hamilton Avenue Bridge


Facing east, western end of Project limits from Washington Street, headine east
Facing east, western end of Project limits from Washington Street


End June aerial photos: View of Project limits from western end
End June aerial photos: View of Project limits from western end


Workers place 20,000 lb. block at the base of Retaining Wall 106, north of future Plank Road East
Workers place 20,000 lb. block at the base of Retaining Wall 106, north of future Plank Road East


flag
Hamilton Avenue Bridge abutment construction


Progress in the Scott Road Bridge Vicinity, 2015 to 2017
Progress in the Scott Road Bridge Vicinity, 2015 to 2017


Progressive comparison of I-84 bridge over Mad River; traffic is currently shifted onto the new southern portion of the bridge while the northern half is under construction.
Progressive views of I-84 bridge over Mad River; traffic is currently shifted onto the new southern portion of the bridge while the northern half is under construction.


Includes new: WB off ramp; western portion of bridge; I-84 median & lanes; temp EB loop ramp; retaining wall & sound barrier wall at EB off ramp. Current construction: EB 25 off ramp; EB on ramp; and eastern portion of bridge
Facing east – Includes new: WB off ramp; western portion of HA bridge; I-84 median & lanes; temp EB loop ramp; retaining wall & sound barrier wall at EB off ramp. Current construction: EB 25 off ramp; EB on ramp; and eastern portion of HA bridge


Facing west - Harpers Ferry Road vicinity with 3 new bridges and Reidville Drive under construction
Facing west – Harpers Ferry Road vicinity with 3 new bridges and Reidville Drive under construction


Workers install steel girders on the northern portion of the future I-84 bridge over the Mad River's western crossing.
Workers install steel girders on the northern portion of the future I-84 bridge over the Mad River’s western crossing.


Looking west from Mad River, steel girders in place on the northern portion of the future I-84 bridge
Looking north from Mad River, steel girders in place on the northern portion of the future I-84 bridge


Crane lowers steel girder into place on new I-84 bridge over Mad River
Crane lowers steel girder into place on new I-84 bridge over Mad River


Workers install diaphragms between steel girders
Workers install diaphragm between steel girders


Can You Identify New Roadways?
Can You Identify New Roadways?


Solutions to "Can You Identify New Roadways?" Quiz
Solution to Can You Identify New Roadways? Quiz


Hamilton Avenue Bridge Vicinity - Sketch of future roadways over recent construction photo
Hamilton Avenue Bridge Vicinity – Sketch of future roadways over recent construction photo


Hamilton Avenue Bridge Vicinity
Hamilton Avenue Bridge Vicinity


Harpers Ferry Road Bridge Vicinity - Sketch of future roadways over recent construction photo
Harpers Ferry Road Bridge Vicinity – Sketch of future roadways over recent construction photo


Harpers Ferry Road Bridge vicinity
Harpers Ferry Road Bridge vicinity


Scott Road Bridge Vicinity - Sketch of future roadways over recent construction photo
Scott Road Bridge Vicinity – Sketch of future roadways over recent construction photo


Facing east from vicinity of western project limits; new median, loop ramp, and Hamilton Avenue Bridge
Begin May aerial shots from western end of Project limits:
(Above) Facing east from vicinity of western project limits; new median, loop ramp, and Hamilton Avenue Bridge


Facing east from Hamilton Avenue Bridge to Harpers Ferry Road vicinity, and beyond
Facing east from Hamilton Avenue Bridge to Harpers Ferry Road vicinity, and beyond


With north at top, Hamilton Avenue Bridge with construction of new footing for south eastern portion of bridge, and EB 23 on ramp
Hamilton Avenue Bridge (north at top) with construction of new footing for south eastern portion, and EB 23 on ramp


With west at top, Hamilton Avenue Bridge construction of new footing for eastern portion of bridge
With west at top, Hamilton Avenue Bridge construction of new footing for eastern portion of bridge


Facing south west, Hamilton Avenue Bridge with construction of new eastern portion of bridge, and EB 23 on ramp
Facing south west, Hamilton Avenue Bridge with construction of new eastern portion of bridge, and EB 23 on ramp


East of Hamilton Avenue Bridge, beginnings of new retaining walls on both sides of future EB 23 on ramp
East of Hamilton Avenue Bridge, beginnings of new retaining walls on both sides of future EB 23 on ramp


Facing south, new retaining walls on both sides of future EB 23 on ramp, on ramp abutment, and Hamilton Avenue Bridge construction
Facing south, new retaining walls for future EB 23 on ramp, on ramp abutment, and Hamilton Avenue Bridge construction


Facing south, Retaining wall east of Hamilton Avenue Bridge, footprint for new EB 25 off ramp, new EB 23 on ramp, I-84 EB/WB, retaining wall at WB 23 off ramp
Facing south, from top to bottom: retaining wall east of Hamilton Avenue Bridge, footprint for new EB 25 off ramp, new EB 23 on ramp, I-84 EB/WB, retaining wall along northern side of future WB I-84 and WB 23 off ramp


Facing west, construction of northern portion of new I-84 bridge over the Mad River, western crossing; future EB 25 off ramp far left)
Facing west, construction of northern portion of new I-84 bridge over the Mad River; future EB 25 off ramp (far left)


Facing west, from left to right: new pedestrian bridge, future EB 25 off ramp, I-84 EB/WB, new northern portion of new I-84 bridge over the Mad River
Facing west, from left to right: new pedestrian bridge, future EB 25 off ramp, I-84 EB/WB, northern portion of new I-84 bridge over the Mad River


Facing southwest, new EB 25 off ramp and off ramp bridge to Harpers Ferry Road
Facing southwest, new EB 25 off ramp and off ramp bridge to Harpers Ferry Road


Facing south, from top left to bottom right, new path for Reidville Drive adjacent to rock cut wall, new Harpers Ferry Road Bridge, new I-84 WB & EB bridge and new WB 25 off ramp over the Mad River
Facing south, from left to right, new path for Reidville Drive adjacent to rock cut wall, new Harpers Ferry Road Bridge, new I-84 WB & EB bridge and new WB 25 off ramp over the Mad River


Facing east, from left to right, I-84 WB, EB, Existing EB 25 off ramp, new Harpers Ferry Road Bridge, new I-84 WB & EB bridge,  new path for Reidville Drive adjacent to rock cut wall, and new WB 25 off ramp over the Mad River
Facing east, from left to right, I-84 WB, EB, existing EB 25 off ramp, new Harpers Ferry Road Bridge, new I-84 WB & EB bridge, new path for Reidville Drive adjacent to rock cut wall, and new WB 25 off ramp over the Mad River


Facing east, future intersection of Reidville Drive, Harpers Ferry Road and EB 25 off ramp
Facing east, future intersection of Reidville Drive, Harpers Ferry Road, and EB 25 off ramp


Facing northeast, view of Plank Road vicinity with construction of three bridges west of Harpers Ferry Road
Facing northeast, view of Plank Road vicinity with construction of three bridges west of Harpers Ferry Road


Plank Road vicinity north of I-84 and Harpers Ferry Road Bridge
Plank Road vicinity north of I-84 and Harpers Ferry Road Bridge


Plank Road vicinity with new sewer work, pavement and sidewalks
Plank Road vicinity with new sewer work, pavement, and sidewalks


Plank Road Cul-de-Sac; former and permanently closed WB 24 off ramp (permanently closed)
Facing west, Plank Road Cul-de-Sac; former and permanently closed WB 24 off ramp


Realignment of Reidville Drive to be adjacent to rock cut wall
Realignment of Reidville Drive to be adjacent to rock cut wall


Reidville Drive with culvert work
Reidville Drive with culvert work


Facing west, view of Reidville Drive future alignment to Harpers Ferry Road
Facing west, view of Reidville Drive future alignment to Harpers Ferry Road


Future path of Plank Road East, a local road to run adjacent to WB I-84 between Harpers Ferry and Scott Roads.
Left – future path of Plank Road East, a local road adjacent to WB I-84 between Harpers Ferry and Scott Roads.


Facing north, excavation and soil nail wall construction for future path of Plank Road East to run adjacent to WB I-84 between Harpers Ferry and Scott Roads.
Facing north, excavation and soil nail wall construction for a retaining wall along the future path of Plank Road East to run adjacent to WB I-84 between Harpers Ferry and Scott Roads.


Excavation and construction of soil nail wall for new retaining wall along Plank Road East
Excavation and construction of soil nail wall for new retaining wall along Plank Road East


Facing east, Scott Road Bridge vicinity
Facing east, Scott Road Bridge vicinity


Facing north, Scott Road Bridge with structural steel on eastern portion of new bridge
Facing north, Scott Road Bridge with structural steel on eastern portion of new bridge


Facing northwest, Scott Road Bridge with paved future WB 25 off ramp north of I-84
Facing northwest, Scott Road Bridge with paved future WB 25 off ramp north of I-84


Facing northwest, Scott Road Bridge, paved future Plank Road East left of Scott Road, & WB 25 off ramp to the right
Facing northwest, Scott Road Bridge, paved future Plank Road East left of Scott Road, and WB 25 off ramp to the right


Future Plank Road East west of Scott Road
Future Plank Road East west of Scott Road


Facing west, Scott Road Bridge vicinity I-84 new median, realigned Beaver Pond Brook, and future WB 25 off ramp
Facing west, Scott Road Bridge vicinity I-84 new median, realigned Beaver Pond Brook, and future WB 25 off ramp


Construction of new sound barrier wall along future WB 25 off ramp
Construction of new sound barrier wall along future WB 25 off ramp


Construction of new sound barrier wall along future WB 25 off ramp continues along ramp toward Scott Road
Construction of new sound barrier wall along future WB 25 off ramp continues along ramp toward Scott Road


Facing east, construction of EB I-84; new median to Pierpont RoadAC
Facing east, construction of EB I-84; new median to Pierpont Road


Facing east from eastern end of Project limits, with sound barrier wall along WB I-84
Facing east from eastern end of Project limits, with sound barrier wall along WB I-84


Facing east, the vivew from eastern Project limits -- End May aerial photos
Facing east, the view from eastern Project limits — END May aerial photo series


Paving Plank Road, May 19, 2017
Paving Plank Road, May 19, 2017


Paving Plank Road
Paving Plank Road


New sidewalks, and paving in progress on Plank Road
New sidewalks, and paving in progress on Plank Road


Workers install steel girders at night over I-84 for new eastern portion of Scott Road Bridge
Workers install steel girders at night over I-84 for new eastern portion of Scott Road Bridge


Workers install steel girders at night over I-84 for new eastern portion of Scott Road Bridge
Workers install steel girders at night over I-84 for new eastern portion of Scott Road Bridge


Structural steel installation on a moonlit night
Installing utility diaphragms on the steel girders; a moonlit night


Facing southeast at EB 23 off ramp - the west end of the project from Washington Street
Begin April 2017 aerial photos: Facing southeast at EB 23 off ramp – the west end of the project from Washington Street


Facing East - I-84 with Hamilton Avenue Bridge vicinity
Facing east – I-84 with Hamilton Avenue Bridge vicinity


New western portion of Hamilton Avenue Bridge with eastern portion demolished
New western portion of Hamilton Avenue Bridge with eastern portion demolished


Site of new EB 23 on ramp east at Hamilton Avenue Bridge and south of I-84
Site of new EB 23 on ramp east of Hamilton Avenue Bridge and south of I-84


Facing west, hamilton Avenue Bridge with new loop ramp (top left), site for new EB 23 on ramp (bottom left), and new WB 23 off ramp (right)
Facing west, Hamilton Avenue Bridge with new loop ramp (top left), site for new EB 23 on ramp (bottom left), and new WB 23 off ramp (right)


Facing east, from new bridge over Mad River's western crossing to Harpers Ferry Road
Facing east, from new bridge over Mad River’s western crossing to Harpers Ferry Road


Facing northeast, new southern portion of I-84 bridge and EB 25 off ramp over Mad River's western crossing
Facing northeast, new southern portion of I-84 bridge and EB 25 off ramp over Mad River’s western crossing


Facing southwest, northern portion of I-84 bridge abutments under construction north of new bridge
Facing southwest, abutments for northern portion of new I-84 bridge under construction north of new bridge


Facing west, future EB 25 off ramp and I-84 EB/WB bridge decks over Mad River, and structural steel on new Harpers Ferry Road bridge
Facing west, future EB 25 off ramp and I-84 EB/WB bridge decks over Mad River; and structural steel on new Harpers Ferry Road bridge


Structural steel for new Harpers Ferry Road over future I-84
Structural steel for new Harpers Ferry Road over future I-84


Bridge decks for future WB/EB I-84 (left) and for future EB 25 off ramp to Harpers Ferry Road
Bridge decks for future WB/EB I-84 (left), and for future EB 25 off ramp to Harpers Ferry Road (right)


Facing east, Reidville rock cut -- future site of Reidville Drive
Facing east, Reidville rock cut — future site of Reidville Drive


Facing southwest, Plank Road vicinity (left); Harpers Ferry Road (top right)
Facing southwest, Plank Road vicinity (left); Harpers Ferry Road (top right)


Three new bridges west of Harpers Ferry Road, and Plank Road vicinity north of I-84
Three new bridges west of Harpers Ferry Road; Plank Road vicinity north of I-84


Excavation for retaining wall along north side of future Plank Road East
Excavation for retaining wall along north side of future Plank Road East


Retaining wall and new culvert construction north of I-84 and south of the WB 25 on ramp
Retaining wall and new culvert construction north of I-84 and south of the WB 25 on ramp


Construction of: eastern portion of Scott Road Bridge; and future Plank Road East and EB 25 off ramp north of I-84
Construction of: eastern portion of Scott Road Bridge; future Plank Road East and EB 25 off ramp north of I-84


Facing west, future EB 25 off ramp is between I-84 and the relocated Beaver Pond Brook
Facing west, future EB 25 off ramp is between I-84 and the relocated Beaver Pond Brook


West of Scott Road Bridge, Future Plank Road East paved over new culvert (between I-84 and existing Plank Rd)
West of Scott Road Bridge, Future Plank Road East paved over new culvert (between I-84 and existing Plank Rd)


Facing south, Scott Road Bridge vicinity
Facing south, Scott Road Bridge vicinity


East of Scott Road Bridge, future WB 25 off ramp with relocated Beaver Pond Brook and existing ramp north of it
East of Scott Road Bridge, future WB 25 off ramp with relocated Beaver Pond Brook and existing ramp north of it


Sound barrier wall along WB I-84, west of Pierpont Road
Sound barrier wall along WB I-84, west of Pierpont Road


Facing west toward Scott Road, I-84 EB lane construction
Facing west toward Scott Road, I-84 EB lane construction (lower left)


Facing west toward Scott Road, I-84 EB lane construction (lower left)
Facing west toward Scott Road— End April aerial photos


Project Engineer Chris Zukowski and project team discuss highway sound mitigation 4/12/2017 at the request of the East End Community Club.
Project Engineer Chris Zukowski and project team discuss highway sound mitigation 4/12/2017 at the request of the East End Community Club.


District Engineer John Dunham (left) answers questions from attendees at the East End Community Club meeting.
District Engineer John Dunham (left) answers questions from attendees at the East End Community Club meeting.


Chris Zukowski shares future landscaping plans, including locations and types of vegetation.
Chris Zukowski shares future landscaping plans, including locations and types of vegetation.