I-84 Waterbury Widening

I-84 Waterbury Widening

Images go here.

Construction Weekly Project Update 8/20/2018

Bridges

Bridge 6590 (Future EB 23 on-ramp, east of Hamilton Avenue Bridge)

Bridge 1226 (Harpers Ferry Road Bridge)

Bridge 6591 (Future WB 25 on-ramp, west of Harpers Ferry Road)

Bridge 1228 (Scott Road Bridge which will be renamed the Najla G. Noujaim
Memorial Bridge)

Local Roads

Harpers Ferry Road

Future Plank Road East

I-84 Mainline

I-84 EB (between median and barrier east of Scott Road Bridge, adjacent to EB 25 on-ramp)

Miscellaneous work

Night Work

One-lane closures possible between 9:30 PM and 6:00 AM, Sunday through Friday nights

Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)

Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.