Construction Weekly Project Update 7/2/2018

Please see our Interactive Map of the Project limits, with the locations of the construction sites below.
This map is also accessible from our homepage.

Bridges

Bridge 4321 (Hamilton Avenue Bridge)

Bridge 6590 (Future EB 23 on-ramp, east of Hamilton Avenue Bridge)

Bridge 1226 (Harpers Ferry Road Bridge)

Bridge 6591 (Future WB 25 on-ramp, west of Harpers Ferry Road)

Bridge 1228 (Scott Road Bridge which will be renamed the Najla G. Noujaim
Memorial Bridge by Public Act 17-230 section 34)

Culverts

Culvert 1227 (Under I-84, east of Harpers Ferry Road)

Retaining Walls

Retaining Wall 115 (South side of future WB 25 on-ramp, west of Harpers Ferry Road)

Retaining Walls 102 and 103 (On both sides of future EB 23 on-ramp)

Local Roads

Harpers Ferry Road

Future Plank Road East

I-84 Mainline

WB 25 off-ramp (former off-ramp to Scott Road)

I-84 WB (along WB 25A on-ramp, and westward)

Miscellaneous work project-wide

Night Work

One-lane closures possible between 9:30 PM and 6:00 AM, Sunday, Monday, Thursday, and Friday nights
No lane closures Tuesday or Wednesday nights this week

Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)

Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.