I-84 Waterbury Widening

I-84 Waterbury Widening

Images go here.

Construction Weekly Project Update 6/13/2016

Bridges

Bridge 4321 (Hamilton Avenue over I-84)

Bridge 1224 (I-84 over Mad River, western crossing)

Bridge 5774 (Future I-84 over Mad River eastern crossing)

Bridge 6284 (future EB 25 off ramp over Mad River)

Bridge 1226 (Harpers Ferry Road over I-84)

Retaining Walls

Retaining Wall 101 (along I-84 east, of WB Exit 23 off ramp)
Begin to set parapet

Retaining Wall 109 (along I-84, east of WB Exit 25 off ramp)

Retaining Wall 110 (along I-84, east of EB 25 on ramp)

Retaining Wall 113 and 114 (along both sides of future EB 25 off ramp)

I-84 EB

I-84 EB (west of Scott Road parallel to Reidville Drive)

I-84 EB off ramp (EB Exit 23 Hamilton Ave)

Local Roads

Reidville Drive

Scott Road (Culvert 014 at Scott Road south of WB 25 off ramp)

Plank Road

Rock Blasting

Waste Stockpile Area (WSA)/Reuse Stockpile Area (RSA)

Night Work on Hamilton Avenue Bridge – Detour Information

I-84 will close and be detoured at Exit 23 between the hours of 11:00 PM to 5:00 AM for night time steel erection on the Hamilton Avenue Bridge, on June 14 through June 22, 2016.

Nighttime closures will occur Sunday through Thursday nights as follows:

Detour routes from I-84 EB and WB Exit 23 off ramps are as follows:

Motorists will be guided through the detour route by construction signage, State, and local Police.

The closure of I-84 is to ensure safety of the traveling public during construction.

Hamilton Avenue Bridge Deour for Steel Erection