I-84 Waterbury Widening

I-84 Waterbury Widening

Images go here.

Construction Weekly Project Update 2/29/2016

Bridges

Bridge 4321 (Hamilton Avenue over I-84)

Bridge 1224 (I-84 over Mad River, western crossing)

Bridge 5774 (Future I-84 over Mad River, eastern crossing)

Bridge 6284 (Future EB Exit 25 off ramp over Mad River)

Retaining Walls

Retaining Wall 101 (along I-84 east of WB Exit 23 off ramp)

Retaining Wall 104 (south of EB 23 on ramp)

Retaining Wall 110 (along I-84 EB, east of EB 25 on ramp)

Retaining Wall 111 (along I-84, WB west of Pierpont Road)

Retaining Wall 113/114 (along both sides of future EB Exit 25 off ramp)

Sewer Work

Jacking Pit (under I-84 adjacent to old WB 24 off ramp)

Retaining Wall 104 (south of EB 23 on ramp)

I-84 Exit 25 WB off ramp – Scott Rd/Beaver Pond Brook

Local Roads

Reidville Drive

Plank Road East (just west of Scott Road)

Rock Blasting

Waste Stockpile Area (WSA)

Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing).