Construction Weekly Project Update 10/05/2015
- I-84
- WB 23 off ramp
- Bridges
- Retaining Walls
- Local Roads
- Sewer Pipe Under I-84
- Rock Blasting
- Waste Stockpile Area (WSA)
I-84
I-84 median Harpers Ferry Road to Austin Road – Place permanent barrier (night work)
WB 23 off ramp
Construct new WB 23 off ramp (north of existing ramp)
Bridges
Bridge 4321 (Hamilton Avenue over I-84)
- Demolition of existing abutments north and south (night work)
- Construction of south abutment, stem and wing walls (western portion)
- Continue construction of southern pier
Bridge 5774 (new I-84 over Mad River – eastern crossing)
- Complete cofferdam
- Drive test piles for abutment 1
Bridge 6284 (EB 25 off ramp over Mad River)
- Drive pile for foundation at abutment 1
Bridge 1226 (Harpers Ferry Road over I-84)
Bridge 1224 (I-84 western crossing over Mad River)
- Install shielding
- Install temporary earth retaining system, abutment 1
- Demolition of existing superstructure (night work)
Retaining Walls
Retaining Wall 104 construction (south of EB 23 on ramp)
Local Roads
Plank Road
- Sewer/water work east of Plank Road culvert
- Continue to build roadway over box culvert
- Excavate, form, and pour wing walls east of culvert
- Detour in place between Harpers Ferry Road and White Oak Lane
Reidville Drive
- One lane closed intermittently with alternating traffic
- Excavation and trucking of materials
Sewer Pipe Under I-84
Establish connections in receiving pit for new sewer pipe under I-84, east of Hamilton Avenue.
Rock Blasting
Rock blasting to occur along Reidville Drive, Tuesday, Wednesday, and Thursday intermittently between 9:30 AM and 11:30 AM.
Traffic stoppages on I-84, Hamilton Ave., Harpers Ferry Road and Reidville Drive to be implemented at time of blasts for safety reasons.
Waste Stockpile Area (WSA)
Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing).