Construction Weekly Project Update 12/17/2018
Local Roads
- Backfill curbs; miscellaneous finishing work
Retaining Walls
Retaining Wall 109 (Westbound I-84 east of WB 25 off-ramp)
- Install remaining sound barrier wall
Miscellaneous work – Various Locations Project-wide
- Fence installation
- Environmental and river work – Mad River final finish work
- Install guide rail (night)
- Install permanent pavement markings and symbols
- Install fire suppression system on bridge decks
Lane Closures
Daytime:
I-84: Lane closures possible from 9:00 AM to 3:00 PM on eastbound and
westbound for miscellaneous guide rail/fence/signing work
Nighttime: One lane clousure possible between 9:00 PM and 6:00 AM, Sunday through Thursday
- Miscellaneous barrier moves
- Installation of guide rail on I-84
- Install permanent pavement markings
Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)
Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.