Construction Weekly Project Update 12/10/2018
Bridges
Project-wide
- Miscellaneous bridge work
Bridge 6591 (Future WB 25 on-ramp, west of Harpers Ferry Road)
- Open new WB 25 on-ramp (close existing ramp west of Scott Road)
Local Roads
Reidville Drive
Scott Road (from East Main Street to Reidville Drive)
- Complete permanent signalization
Plank Road East
- Open new road between Scott Road and Harpers Ferry Road
I-84 WB
- Open new WB 25 on-ramp (close existing ramp west of Scott Road)
I-84 EB and WB
- Install overhead signs – traffic stoppages (15 minutes)
Miscellaneous work – Various Locations Project-wide
- Fence installation
- Environmental and river work – Mad River final finish work
- Install guide rail (night)
- Install permanent embedded pavement markings (night)
Lane Closures
Daytime: Lane closures possible from 9:00 AM to 3:00 PM on eastbound and westbound I-84 for:
- Miscellaneous guide rail/fence/sign installation
Night work: Lane closures; possible delays: One lane may be open between 9:00 PM and 6:00 AM; two lanes will be open from 8:00 PM to 9:00 PM, Sunday through Friday nights
- Miscellaneous barrier moves
- Installation of guide rail on I-84
- Reconstruction of local roads
- Permanent pavement markings
Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)
Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.