Construction Weekly Project Update 11/12/2018
- Bridges
- Retaining Walls
- Local Roads
- I-84 Mainline
- Lane Closures
- Waste Stockpile Area (WSA)
Bridges
Project-wide
- Miscellaneous bridge work
Bridge 6591 (Future WB 25 on-ramp, west of Harpers Ferry Road)
- Demolish former WB I-84 bridge
- Pave
Bridge 4321 (Hamilton Avenue Bridge)
- Sidewalk completion, west side
Retaining Walls
Retaining Wall 121 (East Main Street, west of Scott Road)
- Install driveway aprons and sidewalk
Retaining Wall 109 (Westbound I-84 east of WB 25 off-ramp)
- Install remaining sound barrier wall
Local Roads
East Main Street/Plank Road East/Reidville Drive
- Driveway restoration
- Pave
I-84 Mainline
- Guide rail installation (night)
- Complete paving of ramps (day/night)
- Asphalt finishing work (night)
Miscellaneous work – Various Locations Project-wide
- Install overhead and side-mounted signs
- Install fiber optic cable
- Fence installation
- Landscape/wetlands plantings
- Paint touch up on structural steel
- Line stripe
- Environmental and river work – Mad River final finish work
Lane Closures
Daytime: Lane closures possible from 9:00 AM to 3:00 PM on eastbound and westbound I-84 for:
- Miscellaneous guide rail/fence/signing work
Night work: Lane closures; possible delays: One lane may be open between 9:00 PM and 6:00 AM; two lanes will be open from 8:00 PM to 9:00 PM, Sunday through Friday nights – Daily updates will be posted
- Miscellaneous barrier moves
- Installation of guide rail on I-84
- Reconstruction of local roads
- paving of I-84 ramps
h3. Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)
Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.