Construction Weekly Project Update 10/29/2018

Bridges

Bridge 6591 (Future WB 25 on-ramp, west of Harpers Ferry Road)

Bridge 1228 (Scott Road Bridge which will be renamed the Najla G. Noujaim
Memorial Bridge)

Retaining Walls

Retaining Wall 121 (East Main Street, west of Scott Road)

Retaining Wall 109 (Westbound I-84 east of WB 25 off-ramp)

Local Roads

East Main Street/Scott Road/Reidville Drive

Scott Road/Reidville Drive/Hamilton Avenue

East Main Street/Plank Road East

Reidville Drive/Hamilton Avenue

WB I-84

Miscellaneous work – Various Locations Project-wide

Lane Closures

Daytime: Lane closures possible from 9:00 AM to 3:00 PM on eastbound and westbound I-84 for:

Night work: Lane closures; possible delays: One lane may be open between 9:00 PM and 6:00 AM; two lanes will be open from 8:00 PM to 9:00 PM, Sunday through Friday nights – Daily updates will be posted

Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)

Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.