Construction Weekly Project Update 10/15/2018
- Bridges
- Retaining Walls
- Local Roads
- I-84 Mainline
- Night Work
- Waste Stockpile Area (WSA)
Bridges
Bridge 6591 (Future WB 25 on-ramp, west of Harpers Ferry Road)
- Install parapet and approach slabs
Bridge 1228 (Scott Road Bridge which will be renamed the Najla G. Noujaim
Memorial Bridge)
- Pave approaches on bridge
- Shift traffic to western portion of bridge to complete eastern sidewalk
Retaining Walls
Retaining Wall 121 (East Main Street, west of Scott Road)
- Turf establishment/install fencing
Local Roads
East Main Street
East Main Street/Scott Road/Reidville Drive
Reidville Drive
- Mill, and install drainage/curb/sidewalk
Scott Road
- Mill/pave (night)
- Curb/sidewalk (day)
Plank Road East
- Pave (from Scott Road to interim on-ramp)
- Install sound barrier wall
WB I-84
EB I-84
Miscellaneous work
- Barrier moves (night)
- Mill/pave/stripe
- Fence installation
- landscape/wetland plantings Project-wide
Night Work
Lane closures; possible delays: One lane may be open between 9:00 PM and 6:00 AM; two lanes will be open from 8:00 PM to 9:00 PM, Sunday through Friday nights
- Milling/paving/striping
- Miscellaneous barrier moves
- Reconstruction of East Main Street
Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)
Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.