Construction Weekly Project Update 5/7/2018

Bridges

Bridge 4321 (Hamilton Avenue Bridge)

Bridge 1226 (Harpers Ferry Road Bridge)

Bridge 5774 (future WB I-84 bridge over Mad River)

Bridge 6591 (Future WB 25 on-ramp, west of Harpers Ferry Road)

Bridge 1228 (Scott Road Bridge)

I-84 Mainline

WB I-84

WB 25 off-ramp (former off-ramp to Scott Road)

WB 25A on-ramp

Miscellaneous work project wide

Night Work (One-lane closures possible between 9:30 PM and 6:00 AM, Sunday through Thursday nights)

Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)

Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.