Construction Weekly Project Update 5/7/2018
- Bridges
- I-84
- Night Work
- Waste Stockpile Area (WSA)
Bridges
Bridge 4321 (Hamilton Avenue Bridge)
- Place concrete for bridge deck
Bridge 1226 (Harpers Ferry Road Bridge)
Bridge 5774 (future WB I-84 bridge over Mad River)
- Apply membrane waterproofing on deck
Bridge 6591 (Future WB 25 on-ramp, west of Harpers Ferry Road)
- Form and pour abutment 1 stem and wingwall
- Drive cofferdam and piles for abutment 2
- Temporarily relocate Mad River
Bridge 1228 (Scott Road Bridge)
- Excavation at abutment 1
- Form and pour abutment 2 stems
I-84 Mainline
WB I-84
- Shift WB I-84 mainline traffic from west of Scott Road to Bridge 1224 (I-84 bridge over the Mad River, western crossing, south of Hamilton Park) (Night work)
WB 25 off-ramp (former off-ramp to Scott Road)
WB 25A on-ramp
- Install sound barrier wall and overhead signs
Miscellaneous work project wide
- Install overhead sign foundations at Washington Street/Hamilton Avenue
Night Work (One-lane closures possible between 9:30 PM and 6:00 AM, Sunday through Thursday nights)
Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)
Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.