Construction Weekly Project Update 4/30/2018

Bridges

Bridge 4321 (Hamilton Avenue Bridge)

Bridge 1226 (Harpers Ferry Road Bridge)

Bridge 5774 (future WB I-84 bridge over Mad River)

Bridge 6591 (Future WB 25 on-ramp, west of Harpers Ferry Road)

Bridge 1228 (Scott Road Bridge)

I-84 Mainline

WB I-84

WB 25 off-ramp (former off-ramp to Scott Road)

WB 25A on-ramp

Miscellaneous work project wide

Night Work (One-lane closures possible between 9:30 PM and 6:00 AM, Sunday through Thursday nights)

Rock Blasting

Rock blasting to occur along the southwestern end of Scott Road Bridge: When I-84 needs to be stopped for safety reasons, blasting will occur on Tuesday, Wednesday, and Thursday between 9:30 AM and 11:30 AM. Traffic stoppages on I-84, WB 25 off-ramp, Scott Road, Plank Road East, East Main Street and Reidville Drive to be implemented at time of blasts for safety reasons.

Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)

Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.