Images go here.
Bridge 4321 (Hamilton Avenue Bridge over I-84)
Bridge 6590 (EB 23 on ramp)
Bridge 1226 (Harpers Ferry Road Bridge)
Bridge 1224 (I-84 bridge over Mad River, western crossing)
Bridge 5774 (future I-84 bridge over Mad River)
Bridge 1228 (Scott Road Bridge)
Retaining Wall 107 (along EB I-84 west of Scott Road Bridge)
Mainline Median WB (Between Retaining Wall 108 and interim WB 25 on-ramp)
I-84 east of WB 25 on-ramp (Culvert 02537; Beaver Pond Brook under I-84)
I-84 Eastbound Mainline – (Bridge 5774 to Culvert 02537)
WB 25A on-ramp
Miscellaneous Work Locations on Mainline
Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.