I-84 Waterbury Widening

I-84 Waterbury Widening

Images go here.

Construction Weekly Project Update 7/17/2017

Bridges

Bridge 4321 (Hamilton Avenue over I-84)

Bridge 6590 (EB 23 on ramp)

Bridge 1224 (I-84 bridge over Mad River, western crossing)

Bridge 1226 (Harpers Ferry Road Bridge)

Bridge 6284 (future EB 25 off ramp)

Bridge 1228 (Scott Road Bridge)

Retaining Walls

Retaining Wall 101 (along WB I-84 and east of WB 23 off ramp)

Retaining Wall 106 (north of WB I-84 west of WB 25 off ramp)

I-84

I-84 Mainline (along WB Exit 25 on ramp)

I-84 EB (from EB 25 on ramp to Pierpont Road)

I-84 Mainline Median (median opposite Retaining Wall 106)

Local Roads

Reidville Drive

Future Plank Road East (adjacent to existing WB 25 on ramp, along west end of Retaining Wall 106)

East Main Street

Night Work

Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)

Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.