Construction Weekly Project Update 6/12/2017

Bridges

Bridge 4321 (Hamilton Avenue over I-84)

Bridge 6590 (EB 23 on ramp)

Bridge 1224 (I-84 bridge over Mad River, western crossing)

Bridge 1226 (Harpers Ferry Road Bridge)

Bridge 6284 (future EB 25 off ramp)

Bridge 1228 (Scott Road Bridge)

Retaining Walls

Retaining Wall 102 and 103 (along both sides of EB 23 on ramp)

Retaining Wall 106 (north of WB I-84 west of WB 25 off ramp)

I-84

Local Roads

Reidville Drive

Plank Road (from Cul-de-Sac to Harpers Ferry Road)

Plank Road East

Night Work

Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)

Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.