I-84 Waterbury Widening

I-84 Waterbury Widening

Images go here.

Construction Weekly Project Update 5/15/2017

Bridges

Bridge 4321 (Hamilton Avenue over I-84)

Bridge 6590 (EB 23 on ramp)

Bridge 1224 (I-84 bridge over Mad River, western crossing)

Bridge 1226 (Harpers Ferry Road Bridge)

Bridge 5774 (future I-84 bridge over Mad River)

Bridge 6284 (future EB 25 off ramp)

Bridge 1228 (Scott Road Bridge)

Retaining Walls

Retaining Wall 101 (along WB I-84 and east of WB 23 off ramp)

Retaining Wall 106 (north of WB I-84 west of WB 25 off ramp)

I-84

Local Roads

Reidville Drive

Plank Road (Cul-de-sac to Harpers Ferry Road)

Plank Road East

Night Work

I-84 Nighttime Closure and Detour to Begin on Sunday Night at Exit 25 for Scott Road Bridge Steel Installation Activities
I-84 eastbound and westbound will be closed nightly and detoured at Exit 25, starting on Sunday night, May 14, and continuing through Thursday night, May 18, 2017. The closures will take place from 11:00 PM to 5:00 AM.
These temporary detours are in addition to the regular nightly lane closures permitted within the area. If inclement weather causes postponement of work, the rain date will be Sunday, May 21.

DETOUR ROUTES
Motorists will detour from I-84 to local roads, and back to I-84, via detours at both westbound and eastbound Exits 25 as described below.

detour

Miscellaneous pothole repair and drainage

Rock Blasting

Rock blasting to occur on the East End of Project:

Waste Stockpile Area (WSA)/Temporary Reuse Stockpile Area (TRSA)

Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to TRSA at Exit 30 WB.