Construction Weekly Project Update 12/19/2016
- Bridges
- Retaining Walls
- I-84 EB
- Local Roads
- Rock Blasting
- Night Work
- Waste Stockpile Area (WSA)
Bridges
Bridge 4321 (Hamilton Avenue over I-84)
- Demolish existing superstructure (eastern portion) – night work
Bridge 6590 (EB 23 on ramp bridge)
Bridge 1224 (I-84 bridge over Mad River, western crossing)
- Demolish center pier
- Drive cofferdam and piles for abutment 1
Bridge 5774 (future I-84 over Mad River, eastern crossing)
- Form and pour back walls abutment 2
Bridge 6284 (future EB 25 off ramp over Mad River)
- Complete setting and bolting-up structural steel
Bridge 1226 (Harpers Ferry Road over I-84)
- Form and pour backwall abutment 1
- Form and pour stem wall abutment 2
Retaining Walls
Retaining Wall 104 (south of EB 23 on ramp)
Retaining Wall 106 (north of WB I-84 west of WB 25 off ramp)
I-84 EB
- Drill foundations for sound barrier wall between Retaining Wall 104 and Bridge 1224
- Excavate and grade to subgrade from EB 25 on ramp to Pierpont Road vicinity.
Local Roads
Reidville Drive
- Utility work
- Excavation & trucking of materials
- One lane closed intermittently with alternating traffic
Scott Road (Culvert 014 at Scott Road south of WB 25 off ramp)
Plank Road East (Culvert 02537 at Beaver Pond Brook under WB I-84, east of WB 25 on ramp)
- Construct wing walls
- Beaver Pond Brook channel excavation
Rock Blasting
No rock blasting is anticipated this week.
Night Work
Hamilton Avenue Bridge demolition
Waste Stockpile Area (WSA)/Reuse Stockpile Area (RSA)
Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing); Trucking excavated material to RSA at Exit 30 WB.