Construction Weekly Project Update 11/07/2016
- Bridges
- Retaining Walls
- I-84
- Local Roads
- Rock Blasting
- Night Work
- Waste Stockpile Area (WSA)
Bridges
Bridge 4321 (Hamilton Avenue over I-84)
- Install protective shielding and protective fence
Bridge 1224 (I-84 bridge over Mad River, western crossing)
- Continue demolition of northern portion of bridge and excavate
- Install approach slab EB 25 off ramp
- Install parapet EB 25 off ramp
Bridge 5774 (future I-84 over Mad River, eastern crossing)
- Form and pour stem walls and remove cofferdams
Bridge 1226 (Harpers Ferry Road over I-84)
- Soil nail and excavate abutment 2
Bridge 1228 (Scott Road Bridge over I-84)
- Form and pour stem walls at abutment 2 (north of I-84)
- Form and pour stem walls at abutment 1 (south side of I-84)
Retaining Walls
Retaining Wall 106 (north of WB I-84 west of WB 25 off ramp)
Retaining Wall 108 (along I-84, east of WB 25 on ramp)
- Form and pour moment slab
Retaining Wall 113 and 114 (along both sides of future EB 25 off ramp)
- Install parapet moment slab 113 & 114
Retaining Wall 116 (adjacent to Harpers Ferry Road bypass)
- Excavate for leveling pad
I-84
Median reconstruction from Pierpont Road to WB 25 off ramp
I-84 EB (Between EB 23 on ramp and Bridge 1224)
- Drill foundation for noise wall
I-84 EB (West of Hamilton Ave. Bridge)
- Activate temporary I-84 EB on ramp west of Hamilton Ave.
EB 23 on ramp
- Construct temporary ramp
- Pave
Local Roads
Reidville Drive
- Install water utility trench
- Excavation & trucking of materials
- One lane closed intermittently with alternating traffic
Harpers Ferry Road/Brookdale Lane
- Complete driveways and sidewalk
Scott Road (Culvert 014 at Scott Road south of WB 25 off ramp)
Form and pour cutoff walls
Set box culvert
Plank Road East (Culvert 02537 at Beaver Pond Brook under WB I-84 east of WB 25 on ramp)
- Partial excavation and demolition of existing culvert
- Form and pour cutoff footing between Retaining Wall 108 and the culvert
Rock Blasting
- Rock blasting to occur along Reidville Drive. When I-84 needs to be stopped for safety reasons, blasting will occur on Tuesday, Wednesday, and Thursday between 9:30 AM and 11:30 AM.
- When no traffic stoppage on I-84 is required blasting may occur Monday through Friday from 9:00am – 3:00pm.Traffic stoppages on Harpers Ferry Road and Reidville Drive to be implemented at time of blasts for safety reasons.
Night Work
- Lighting along I-84 median.
Waste Stockpile Area (WSA)/Reuse Stockpile Area (RSA)
- Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing)
- Trucking excavated material to RSA at Exit 30 WB.