Construction Weekly Project Update 9/12/2016

Bridges

Bridge 4321 (Hamilton Avenue over I-84)

Bridge 1224 (I-84 over Mad River, western crossing)

Bridge 5774 (future I-84 over Mad River, eastern crossing)

Bridge 6284 (future EB 25 off ramp over Mad River)

Bridge 1226 (Harpers Ferry Road over I-84)

Bridge 1228 (Scott Road Bridge over I-84)

Retaining Walls

Retaining Wall 108 (along I-84, east of WB 25 on ramp)

Retaining Wall 113 and 114 (along both sides of future EB 25 off ramp)

I-84

I-84 EB 23 Off Ramp (EB Exit 23 off ramp to Hamilton Ave)

WB Traffic Shift onto Bridge 1224 (I-84 bridge over Mad River, western crossing)

Median Reconstruction from Pierpont Road to WB 25 Off Ramp

I-84 Exit WB 25 Off Ramp (Beaver Pond Brook/Scott Road)
Excavation/rock removal

Local Roads

Plank Road

Reidville Drive

Plank Road East (west of Scott Road Culvert 06622)

Scott Road (Culvert 014 at Scott Road south of WB 25 off ramp)

Pipe Work

Scott Rd/East Main Street

Hamilton Avenue/Plank Road

Rock Blasting

Rock blasting to occur along WB 25 off ramp/Scott Road.

When I-84 needs to be stopped for safety reasons, blasting will occur on Tuesday, Wednesday, and Thursday between 9:30 AM and 11:30 AM. When no traffic stoppage on I-84 is required blasting may occur Monday through Friday from 9:00 AM – 3:00 PM. Traffic stoppages on I-84, Scott Rd., and WB 25 off ramp to be implemented at time of blasts for safety reasons.

Night Work

Lane closure on I-84, 9:30 PM to 6:00 AM, Sunday through Thursday nights for barrier, grading, drainage work, and traffic shift WB I-84 Bridge 1224.

Waste Stockpile Area (WSA)/Reuse Stockpile Area (RSA)