Construction Weekly Project Update 9/05/2016
- Bridges
- Retaining Walls
- I-84
- Preload Area
- Local Roads
- Rock Blasting
- Night Work
- Waste Stockpile Area (WSA)
Bridges
Bridge 4321 (Hamilton Avenue over I-84)
- Feed water main through sleeve
- Install Gomaco deck machine dry run
- Place concrete deck
Bridge 1224 (I-84 over Mad River, western crossing)
- Install parapet EB 25 off ramp
- Mobilize for demolition of northern portion of bridge
Bridge 5774 (future I-84 over Mad River, eastern crossing)
- Rebar, form and pour footing abutment 2
Bridge 6284 (future EB 25 off ramp over Mad River)
- Install support towers for structural steel
Bridge 1226 (Harpers Ferry Road over I-84)
- Form and pour abutment 1 stem
Bridge 1228 (Scott Road Bridge over I-84)
- Excavate for temporary earth retaining system abutment 1 (south of I-84)
- Form and pour abutment 2 footing (north of I-84)
Retaining Walls
Retaining Wall 108 (along I-84, east of WB 25 on ramp)
- Form and pour leveling pad
- Set concrete blocks
I-84
I-84 EB 23 off ramp (EB Exit 23 off ramp to Hamilton Ave)
Median reconstruction from Pierpont Road to WB 25 off ramp
- Full depth roadway excavation
- Install drainage
I-84 Exit WB 25 off ramp (Beaver Pond Brook/Scott Road)
Excavation/rock removal
Preload Area (South of I-84 between Mad River crossings)
Local Roads
Plank Road
- Gas work at Plank Road/Harpers Ferry Road intersection
Reidville Drive
- Shift traffic at Culvert 003 (just east of the rock cut) over the newly paved southern half of the culvert (so the northern half can be constructed)
- One lane closed intermittently with alternating traffic
- Excavation and trucking of materials
Plank Road East (west of Scott Road Culvert 06622)
- Set wing wall blocks
- Form and pour wingwall leveling pad
Scott Road (Culvert 014 at Scott Road south of WB 25 off ramp)
- Install drainage and full-depth roadway at newly constructed eastern half of culvert
- Install temporary signalization
Rock Blasting
No rock blasting is anticipated this week; Rock blasting will resume at a future date.
Night Work
Lane closure on I-84, 9:30 PM to 6:00 AM, Tuesday through Thursday nights for barrier, grading, and drainage work.
Waste Stockpile Area (WSA)/Reuse Stockpile Area (RSA)
- Trucking of controlled materials from WSA on Route 322 at Exit 28 to disposal facility (ongoing).
- Trucking excavated material to RSA at Exit 30 WB