Construction Weekly Project Update 9/05/2016

Bridges

Bridge 4321 (Hamilton Avenue over I-84)

Bridge 1224 (I-84 over Mad River, western crossing)

Bridge 5774 (future I-84 over Mad River, eastern crossing)

Bridge 6284 (future EB 25 off ramp over Mad River)

Bridge 1226 (Harpers Ferry Road over I-84)

Bridge 1228 (Scott Road Bridge over I-84)

Retaining Walls

Retaining Wall 108 (along I-84, east of WB 25 on ramp)

I-84

I-84 EB 23 off ramp (EB Exit 23 off ramp to Hamilton Ave)

Median reconstruction from Pierpont Road to WB 25 off ramp

I-84 Exit WB 25 off ramp (Beaver Pond Brook/Scott Road)
Excavation/rock removal

Preload Area (South of I-84 between Mad River crossings)

Local Roads

Plank Road

Reidville Drive

Plank Road East (west of Scott Road Culvert 06622)

Scott Road (Culvert 014 at Scott Road south of WB 25 off ramp)

Rock Blasting

No rock blasting is anticipated this week; Rock blasting will resume at a future date.

Night Work

Lane closure on I-84, 9:30 PM to 6:00 AM, Tuesday through Thursday nights for barrier, grading, and drainage work.

Waste Stockpile Area (WSA)/Reuse Stockpile Area (RSA)