I-84 Waterbury Widening

I-84 Waterbury Widening

Images go here.

Construction Weekly Project Update 7/25/2016

Bridges

Bridge 4321 (Hamilton Avenue over I-84)

Bridge 1224 (I-84 over Mad River, western crossing)

Bridge 5774 (future I-84 over Mad River, eastern crossing)

Bridge 6284 (future EB 25 off ramp over Mad River)

Bridge 1226 (Harpers Ferry Road over I-84)

Bridge 1228 (Scott Road Bridge over I-84)

Retaining Walls

Retaining Wall 108 (along I-84, east of WB 25 on ramp)

Retaining Wall 113 and 114 (along both sides of future EB 25 off ramp)

I-84

Median reconstruction WB Hamilton Avenue to Washington Street

I-84 EB 23 on ramp (in front of Retaining Wall 104)

I-84 EB 23 off ramp (EB Exit 23 Hamilton Ave)

I-84 EB 25 on ramp (from Scott Road)

Sewer Work

Retaining Wall 104 (south of EB 23 on ramp)

I-84 WB 25 off ramp (Beaver Pond Brook/Scott Road)

Local Roads

Reidville Drive

Scott Road (Culvert 014 at Scott Road south of WB 25 off ramp)

Rock Blasting

Waste Stockpile Area (WSA)/Reuse Stockpile Area (RSA)

Night Work

Night work is anticipated to continue on I-84 within the project limits (I-84 between Washington Street and Pierpont Road) when it is necessary to close a lane on I-84 for safety purposes from 9:30 PM to 6:00 AM, Sunday through Thursday.